Favorites
LOADING...
Personal Folders
Shared Folders
0
European Commission Directorate-General for International Partnerships (EuropeAid HQ)

Maritime ports: studies, works or mixed

Last update: Nov 28, 2024 Last update: Nov 28, 2024

Details

Location:EU 27
EU 27
Contracting authority type:Development Institution
Status:Awarded
Budget:N/A
Award ceiling:N/A
Award floor:N/A
Sector:Water Navigation & Ports & Shipping
Languages:English
Eligible applicants:Unrestricted / Unspecified
Eligible citizenships:EU 27, Anguilla, Aruba, Bermuda, ...
See more
EU 27, Anguilla, Aruba, Bermuda, British Virgin Islands, Caribbean Netherlands, Cayman Islands, Falkland Islands, French Polynesia, French Southern Territory, Greenland, Moldova, Montserrat, New Caledonia, Pitcairn, Saint Helena, St. Pierre and Miquelon, Turks and Caicos, Ukraine, Wallis and Futuna
Date posted: Sep 26, 2023

Attachments 21

Description

Call updates

28 August 2024

Information update on the 2023 CEF Transport COMPGEN call

Call published: 26/09/2023

Call deadline: 30/01/2024

Indicative budget: EUR 250 000 000

Total budget requested by the applicants: EUR 830 091 917.80

 

Number of admissible and eligible proposals: 48

Number of inadmissible proposals: 2

Number of ineligible proposals: 1

Number of successful proposals: 19

Total budget for the successful proposals: EUR 247 055 102.80


 

Feb 6, 2024 3:05:15 PM

Dear Applicants,

The CEF Transport calls for proposals closed as planned on 30 January 2024 at 17:00. The COMPGEN call received 51 applications requesting over EUR 800 million co-funding from the Connecting Europe Facility. Including all nine calls together, there is an oversubscription of over 3 times the total budget of EUR 7 billion available.

CINEA will check the admissibility and eligibility of the submitted proposals. The evaluation will continue based on the award criteria of the call, with the assistance of external independent experts. The results will be announced in July 2024.

Information of CEF Transport supported projects is published on CINEA public dashboard


Dec 19, 2023 10:47:03 AM

Dear Applicant,

The 9 CEF Transport calls for proposals will soon close on 30 January 2024 at 17:00. In total, 37 topics are open for submission on the Funding & Tenders portal.

We strongly advise you not to wait until the last minute to submit your application!

You may also see the Call page (https://cinea.ec.europa.eu/funding-opportunities/calls-proposals/2023-cef-transport-calls-proposals_en), and the Info Day page (https://cinea.ec.europa.eu/news-events/events/2023-cef-transport-calls-proposals-info-day-2023-10-10_en) to find the presentations and recording of the info day session. In addition, more than 400 FAQs are available on the FAQ support on the Funding & Tenders portal. An excel extract can also be downloaded from Info Day page under the Q&A session.

We wish you the best of luck in your application!


 

Nov 17, 2023 12:40:28 PM

Dear Applicant,

It has come to our attention that the links embedded within the CINEA Guide on economic appraisal for CEF Transport Projects as well as in section 4.2 Economic and Financial analysis to the DG REGIO CBA guidance are no longer functioning.

Please find attached the direct links to these guidance materials:

- DG REGIO Guide to Cost-Benefit Analysis of Investment Projects: https://ec.europa.eu/regional_policy/en/information/publications/guides/2014/guide-to-cost-benefit-analysis-of-investment-projects-for-cohesion-policy-2014-2020 )

- DG REGIO CBA Economic Appraisal Vademecum: https://ec.europa.eu/regional_policy/en/information/publications/guides/2021/economic-appraisal-vademecum-2021-2027-general-principles-and-sector-applications)

We wish you a lot of success with the completion of your applications.

Kind regards,

CEF Transport Evaluation Team


 

Sep 26, 2023 12:00:09 AM

The submission session is now available for: CEF-T-2023-COMPGEN-MARP-WORKS(CEF-INFRA)


Maritime ports: studies, works or mixed

CEF-T-2023-COMPGEN-MARP-WORKS

Programme: Connecting Europe Facility (CEF)
Call: CEF 2 Transport - Projects on the Comprehensive Network – General envelope (CEF-T-2023-COMPGEN)
Type of action: CEF-INFRA CEF Infrastructure Projects
Type of MGA: CEF Action Grant Budget-Based [CEF-AG]
Deadline model: single-stage
Opening date: 26 September 2023
Deadline date: 30 January 2024 17:00:00 Brussels time

Objective:
The objective is to develop transport infrastructure projects in maritime ports on the Comprehensive Network of the TEN-T.

Scope:
Studies and / or works on TEN-T comprehensive maritime ports related to:

port access aiming at providing safe maritime access in the form of breakwaters, access channels, fairways, locks and navigational aids (e.g. radar, buoys);
basic port infrastructure which are not covered under section 6.2.2 ‘Actions related to sustainable and multimodal mobility’ of the Work Programme, and with a priority on:
development of zero or low-emission multimodal solutions;
development of ports’ capacities and facilities in relation with the transportation activities of the offshore wind farms. The involvement of the maritime port in the transportation activities of the offshore wind farms and the need for the basic port infrastructure for those activities should be demonstrated in the proposal; or,
improving connectivity of remote, insular or outermost regions[1] or of Member States with no land border with another Member State.
Such basic port infrastructure may be in the form of turning basins, quay walls, berths, jetties, backfills, land reclamation, which improve the efficiency of the maritime ports and their integration within the TEN-T network. The backfills and land reclamation could be supported as interventions to create space for construction of other basic port infrastructure, e.g. a berth, quay walls, etc, but should not lead to significant added capacity (i.e. increased surface of or creation of new terminals, logistics/cargo handling areas, etc.).

shore-side electricity supply (including an upgrade of electrical grid within the port if it is needed for the shore-side electricity supply);
port reception facilities for oil and other waste (including residues from exhaust gas cleaning systems) to meet environmental requirements;
ensuring year-round navigability by means of capital dredging and ice-breaking facilities. The capital dredging will be supported only as an intervention to remove bottlenecks for the EU short sea shipping;
providing or improving inland waterways/road/rail access and connections within maritime ports. The rail access could cover rail infrastructure e.g., new rail tracks, upgrade of existing rail tracks, adaptation for 740 meter long trains and connections within the maritime ports.
Works projects may include on-site renewable energy generation (synergetic element in accordance with Section 10.6 of the Work Programme), such as photovoltaic power plants, wind turbines etc. that is primarily used for example for the shore-side electricity supply, for the need of the basic port infrastructure and for diverse port operations. Such synergetic elements must improve the socio-economic, climate or environmental benefits of the project and may not exceed 20% of the total eligible costs of the project.

Support will not be given to:

Infrastructure dedicated for cruise ships, except as regards shore-side electricity supply.
infrastructure in shipyards.
maintenance dredging, dredgers and/or dredging equipment.
digital port systems/ICT platforms.
utilities installations (e.g. water, electricity, lighting), auto-mooring, fixed ramps, dolphins, bollards, fenders, and other fixed auxiliary port infrastructure, unless such interventions are proposed as an integral part of a basic port infrastructure.
fixed and/or mobile superstructure (e.g. cargo/passenger terminals, parkings, check-in buildings and areas, storage and stacking areas and facilities, warehouses, multimodal logistics platforms, access gates, port/terminal equipment and vehicles, etc.).
Hinterland connections to the maritime ports are covered by the respective transport mode priorities but may be part of a single project (for instance a project improving the rail access both within and outside the port area). Projects combining hinterland access both within and outside the port area may be submitted either to the maritime ports or to the inland waterways/road/rail topics as appropriate.

Hinterland road access can be supported only if rail access to/within the port does not exist, or it is not currently under construction-and the road access constitutes a significant bottleneck.

The basic port infrastructure for development of zero or low-emission multimodal solutions could include basic port infrastructure for improving the interconnection between the maritime transport and inland waterways.

For merged port entities or entities managing more than one maritime port, only the geographic area of the maritime port indicated in Annex II to Regulation (EU) No 1315/2013 must be included in the project. This does not affect the relevance of hinterland rail connections to the maritime port indicated in Annex II.

In case of a project taking place in more than one port, the activities of the project in the different ports should contribute to a common objective of the project.

Facilities and infrastructure supported under CEF must be accessible for use by all operators on a non-discriminatory basis.

[1]As defined in Article 349 TFEU.

 
 
 
 
Want to unlock full information?
Member-only information. Purchase or upgrade membership to access this information. Procurement notices from over 121+ donors and banks are available here.

Comments • 0

This section allows you to leave comments. Only your team can view them.

Post a comment

JT