Asian Development Bank (HQ)

GMS Ben Luc – Long Thanh Expressway Project- PFR2: Construction of (Km32 450 - Km35 900)

Last update: Nov 14, 2017 Last update: Nov 14, 2017

Details

Locations:Vietnam
Start Date:Sep 26, 2017
End Date:Unknown
Contract value: USD 19,170,940
Sectors:Civil Engineering, Roads & Bridges Civil Engineering, Roads & Bridges
Categories:Works
Date posted:Nov 14, 2017

Associated funding

Associated experts

Description

LOAN NO.: 3391-VIE
Executing Agency: Viet Nam Expressway Corporation
Nature of Contract: Construction
Contract No.: Package A5
Contract Description: Construction of (Km32 450 - Km35 900)
Major contract components of the civil works on the project include the following:
- Access road construction / improvement
- Soft ground treatment by installation of PVDs up to 10m depth
- Embankment construction
- Bored cast-in-situ pile construction 1 to 1.5m diameter, length up to 70m
- Superstructure super tee girder with 40m span
- Superstructure PC concrete box girder with 90m span
- Reinforced concrete box culverts for drainage and crossings
- Longitudinal and cross drainage
- Asphalt treated base course
- Asphaltic concrete pavement
- Crash barriers, signage, road markings
- Environmental mitigation measures such as vegetation or hard noise barriers