Print

Gas Treatment Plant Audit - Water, Waste Water, Noise and Air Measurements
Details
Locations:Syria
Start Date:Jul, 2011
End Date:May, 2012
Sectors: Laboratory & Measurement, Pollution & Waste Management (incl. treatment)
Description
Client: PETROFAC J1-191
Location: Homs - Palmyra, Syrian Arab Republic
Project Description
Earth Link and Advanced Resources Development (ELARD) prepared an Audit report for the Gas Treatment Plant owned by Hayan Petroleum Company, which includes the results of the sampling campaign for the water, wastewater, noise quality and air emissions and quality measurement within the Gas Treatment Plant.
The objective of the this Audit is to assess the noise, industrial water and waste water quality within the gas plant and the air measurements at source (flare stack) and for the ambient air measurements, and compare it with Syrian standards.
Scope of Work
• Measurement of the emitted gases from the flare stack
• Measurement of the noise levels
• Measurement for the waste water discharged through the general sewage network
• Measurement of the quality of produced water discharged through open streams
• Measurement of the quality of indoor air in the work area

