Second Line Between Gökköy – Ayşebaci Stations in Manisa – Bandırma Railway Line Project
Details
Locations:Turkey
Start Date:2015
End Date:2016
Sectors: Civil Engineering, Transport
Description
Client: General Directorate of Turkish State Railways (TCDD)
Location: Balıkesir
Brief Project Description: The project covers 2nd line route development, preparation of route plans, preparation of application projects for station projects (including plant extension, surrounding walls and plant projects) and engineering buildings which are identified in the technical specifications and the contracts or the ones to be determined at a later date by the client, in accordance with the railway line project designed and preparation of the cost estimates to be based on the construction tender of approximately 17 km of railway line within the Gökköy – Ayşebacı line sections of Manisa – Bandırma line in TCDD 3rd Regional Directorate.
With the implementation of the project, it will be ensured that the passengers as well as the freight will be handled in the most economical, the safest and the fastest manner. With the reducing of freight / transport costs which are added on the production costs, a competitive environment will have been allowed to form. Considering the railway line projects which are already running and/or taken into the investment programmes, it will be a significant acquisition that the freights and the passengers of the cities of Bursa, Balıkesir, Manisa and İzmir meet with a fast, efficient, economic, safe and integrated transportation option.
TÜMAŞ Responsibility: Design Services