Description
File reference number attributed by the contracting authority: T108
Description:
Lot 4 comprises the low-voltage installation systems, the lighting systems and the lightning-protection installations for the double high-rise building (height excluding antenna: approximately 185 m, GFA:approximately 100 600 m2 ) and the underground staff car park.The works will be executed at the high-rise building, the underground staff car park and on the project site.
Quantity or scope:
The contract scope comprises the construction works for the low-voltage installation systems, the lighting systems and the lightning-protection installations, mainly involving: low-voltage installation systems for general power, safety power and uninterruptible power supply (UPS) with approximately 490 distributions with integration into an energy-control system. Approximately 45 000 m of different cable-support systems, cable and distribution networks, system-circuit-integrity systems, approximately 13 000 m of busbar-distribution and connection systems for office workplaces.Connections for external facilities, bus system, approximately 31 000 lighting fittings, safety-lighting systems with power-supply systems.Potential equalisation, interior and exterior lightning protection with additional electromagnetic compatibility measures, overvoltage protection devices.
Documentation.
All aforementioned services include the relevant associated ancillary services.
Lot No 4: Heavy-current installations (KG440), low-voltage installation systems, lighting, high-rise building lightning protection.
The notice involves: A public contract.
Duration in months: 41 (from contract award).