Print
2020 Road Construction IDIQ (D0003)
Details
Locations:USA
Start Date:Feb 12, 2021
End Date:Feb 12, 2026
Sectors: Civil Engineering, Roads & Bridges
Description
Notice ID: 1204T020R0005
Contract Award Number: 1240BH21D0003
Description:
This proposed solicitation is intended for the initial award of multiple Indefinite Delivery/ Indefinite Quantity (IDIQ) contracts for road construction and reconstruction activities to cover multiple projects on the Umpqua, Rogue River-Siskiyou, Willamette, Fremont-Winema, Mt. Hood and Siuslaw National Forests, and the Columbia River Gorge National Scenic Area. The major categories of work activities required by the contract include clearing, earthwork, structural embankments, drainage structures, pit/quarry development, road base and surfacing, road structure demolition, road structure construction (such as retaining walls and minor bridge work) and road obliteration (decommissioning). Minor bridge work for new construction includes any simple span bridge structure equal to, or less than 80’-0” span length. Bridge superstructure may be precast reinforced concrete, precast-prestressed concrete, or timber. Bridge abutments may be reinforced concrete or timber grade beams, cast-in-place reinforced concrete shallow foundation, precast concrete modular block foundation, geosynthetic reinforced soil foundation, or driven or drilled steel piling foundation with a cast-in-place concrete pile cap.
Duration: 5 years