Other

Rehabilitation of 'Moselring' Steel Bridge

Last update: Jun 23, 2015 Last update: Jun 23, 2015

Details

Locations:Germany
Start Date:Jan 1, 2005
End Date:Jan 1, 2006
Contract value: 400,000
Sectors:Civil Engineering, Roads & Bridges
Civil Engineering, Roads & Bridges
Categories:Works
Funding Agencies:
Date posted:Apr 19, 2013

Associated funding

Associated experts

Description

The rehabilitation concept included the following works which were carried out by the construction firm:

At the lower side of the superstructure the top layer was dismantled. Following was a new foundation and a new coating was applied. The total thickness of the layers is clearly above the mimimum thickness which is actually requested by regulations.

The surfacing on the footway was cleaned by means of milling and shot peening. Based on a foundation a coating was applied and sandblasted. This results into a good anti-slippery effect especially at the approach areas. The employed companies affected the disposal of waste material in conformity with the valid regulations.

The railings were cleaned and they were coated after a base treatment.

The free reinforcement bars were treated by a surface treatment system according to the German Standard ZTV-SIB. The upper sides of the caps received a silica sand layer. All other exposed surfaces and the entire substructures received an acylic coating in 2 layers for a better optical effect.

The rehabilitation works were carried out between April and August 2006 mainly with the help of a boat scaffolding in several sections. Only in the foreshore areas a standing scaffolding could be employed. In all phases a limited use by pedestrians could be ensured.

Construction data:

Medium span width: up to 60.00 m
Height of suspension pylon: 34.00 m
Diameter of pylon: 0.60 - 1.10 m
Diameter of cables: 8.00 cm
Height of steel superstructure: 0.80 m
Usefuld width between the railings: 3.80 m
Length of railing: 700 m
Coated surface on lower side of superstructure: 2,000 m²
Coated surface on upper side of top sheet: 1,000 m²
Painted surface of lower structures: 500 m².

Client: Municipality of Koblenz, Civil Works Department