Awajan Well Field Rehabilitation in Zarqa Governorate
Details
Locations:Jordan
Start Date:Unknown
End Date:Unknown
Contract value: EUR 2,035,719
Sectors: Civil Engineering, Water & Sanitation
Categories:Works
Funding Agencies:
Date posted:May 31, 2013
Description
The scope of the project is construction of the followings:
- Construction of a new water reservoir of 1000 m3 in the premises of the well 21, 22 yard,
including all necessary valves, fittings, pipes, etc.;
- Construction of a new pumping station in the closed to the new 1000 m3 reservoir, including
all necessary pumps, valves, fittings, pipes, pressure vessels, etc.;
- Replace the borehole pumps and the well heads for the wells 21, 22 and 23.
- Construction of a new well collector pipes from the wells to the new reservoir;
- New chlorination facility;
- New electrical and telemetry installations;
- Construction of a new transmission main from the new PS up to the connection point with
DN 600 pipe which comes from Khaw Pumping Station and goes to Awajan High Reservoir.
- All related structures such as, new connection chamber, air valve, washouts, road and stream
crossing protective structures and thrust anchor blocks.