New construction of an interceptor sewer from existing East Bank Shaft (receiving shaft of Bason sewage pumping station pressure pipe) to Cat Lai waste water treatment plant.
- Average daily flow: Qd = 450.00 m³/d
- Maximum flow: Qmax = 21.06 m³/d
- Total length: L = 6–10 km
- Diameter: d = 3600 mm
- Average level: Z = -40.00 ma.s.l
Feasibility Study
- Variant comparison of three different alignments
- Variant comparison of the hydraulic system
- Pressurized system
- Gravity system - Variant comparison of the construction method
- Open trench method
- Segmental lining method without trench
- Pipe jacking method without trench - Cost calculation
- Selection and proposal of the preferable variant
- Feasibility check
Client:
Peoples Committee HCMC, Vietnam
Wijaya Baru, Malaysia.
Project Manager:
Prof. Max Preussner
Dipl.-Ing. H.-J. Werner.
Contract: International Consultancy Contract.
Finance: Wijaya Baru, Malaysia (privat investment).
Investment sum: 140,000,000 US $ (gross).