United Nations Office for Project Services (HQ)

Rehabilitation of Amran City South Ring Road 3750 meter long, two lanes each 16 m Amran City - Yemen

Last update: Dec 1, 2022 Last update: Dec 1, 2022

Details

Locations:Yemen
Start Date:Jul, 2022
End Date:Jun, 2023
Contract value: USD 1,654,644
Sectors:Roads & Bridges
Roads & Bridges
Categories:Works
Date posted:Dec 1, 2022

Associated funding

Associated experts

Description

Reference: RFQ/2022/41803

Description: Rehabilitation of Amran City South Ring Road 3750 meters long, two lanes each 16 m Amran City - Yemen 

Objectives of contract:

  1. Inspect the Network: This element concerns the need to constantly watch and monitor the condition of the Network so that required maintenance works can be identified in a timely manner.
  2. Traffic Control: This Specification recognises two main levels of requirement; that which merely needs to warn motorists to be cautious of an activity, and that which requires traffic to come to a complete halt in advance of work which temporarily closes a road lane. Whilst the former may require the setting of advance warning signs the latter requires a well-resourced operation including flagmen, barriers and traffic cones
  3. Emergency Works: The full-time presence of a Contractor on a portion of the road Network is an excellent
  4. resource for dealing with unforeseen emergencies that may arise. The speed and efficiency with which problems can be dealt with is an important feature of Term Maintenance contracting. Because of the unpredictable and urgent nature of these works they are normally carried out on the basis of ‘Dayworks’.
  5. Appropriateness of Rates: One of the key objectives in designing a suitable set of distinct items and subcategories for payment has been to ensure that as far as practicably possible, work items are paid for at rates that do accurately reflect the differing resource requirements.
  6. Typical Equipment: Each Item specification includes a listing of the typical equipment required for its performance.
  7. Choice of Measurement Units: Wherever possible, the choice of measurement units has been made to ease the administration burden and to facilitate subsequent verification.

Delivery time: 330 days