Other

Extension programme for Frankfurt Airport

Last update: Jul 3, 2015 Last update: Jul 3, 2015

Details

Locations:Germany
Start Date:Jan 1, 2001
End Date:Dec 31, 2007
Sectors:Civil Engineering, Roads & Bridges
Civil Engineering, Roads & Bridges
Categories:Consulting services
Funding Agencies:
Date posted:Apr 3, 2014

Associated funding

Associated experts

Description

CLIENT: FRAPORT AG.
Frankfurt Airport Services Worldwide.
OBJECT: Lowering of a road under a new designed runway.
COSTS OF CONSTRUCTION: Estimated construction costs for all buildings approx. 30 million Euro.
CONSULTING FEES: 100,000 EUR.
THE SERVICES
    •        Structural Design for the traffic equipments and buildings, phases 1-4.
    •        Load bearing structures, phases 1-2.
    •        Topographical Survey (partially).
    •        Structural design for traffics and engineered buildings, phases 1-6, construction supervision (temporarily).
    •        Process assistance.
    •        As-built plans for the tracks.
    •        Plans for markings and signs.

The co-operation Traffic consisting of the engineering consultings Lahmeyer International, KOCKS CONSULT and Spiekermann were contracted with the technical design for the traffic connections within the extension programme of Frankfurt/Main Airport in November 2001 by the FRAPORT AG.
the services
The following project parts including construction resp. reconstruction of engineered buildings are part of the external traffic development:

Extension of motorway crossing Frankfurt/Main:
    •        an additional track on the route Cologne to Karlsruhe.
    •        adaption of the bridge construction Ellis-Road.
       
Reconstruction of motorway access Zeppelinheim:
    •        an additional track on the route Frankfurt to the Cargo City South.
    •        a new motorway bridge on the motorway A5 caused by additional southern exits.
    •        extension of the bridge Kirschschneise.
    •        extension of the Federal motorway bridge over the Riedbahn.
       
Repositioning of Okriflter Street including a tunnel construction underpassing the Runway Northwest:
    •        extension and reconstruction of Okrifteler Street.
    •        a tunnel under Runway Northwest (approx. 560 m).
    •        a tunnel under rolling bridge West II (approx. 80 m).
    •        a tunnel underpassing Runway West.
       
Within these design tasks, the KOCKS ENGINEERS carried out all design services of the external development incl. tunnels and other constructions connected with the repositioning of Okrifteler Street and the design for operation roads for the airport.
The tunnel underpassing Runway Northwest underpasses a Federal road with 2 tracks and a runway for pedestrians and cyclists.
The construction was built in ground-water level. Between the steel piling construction an underwater concrete base is fitted with an anchorage in the ground. Within this pit a frame construction made of on-site concrete is designed. The traffic way for pedestrians and cyclists is lead within the tunnel and it is separated from the carriageway by means of protective grating. The emergency exits according to guideline RABT are leading to the portals. The aeration fans required according to the aeration certificate can be installed above the runway for pedestrians/cyclists. Further equipment can be positioned in a separate operation building.
The Runway Northwest is planned to be taken into operation in 2011 as the first section of the extension programme.