Assessment of the respective with the essential requirements for constructions acc. ZUT, preparation of a complex report and construction. supervision during construction. on the railway section Iskar - Elin Pelin from km 7+700 to km 22+846
Details
Locations:Bulgaria
Start Date:Jan 19, 2024
End Date:Jan 19, 2026
Contract value: BGN 1,100,000
Sectors: Civil Engineering, Transport
Categories:Consulting services
Funding Agencies:
Date posted:Apr 23, 2024
Description
II.1.1) Title: Assessment of the respective with the essential requirements for constructions acc. ZUT, preparation of a complex report and construction. supervision during construction. on the railway section Iskar - Elin Pelin from km 7+700 to km 22+846
II.1.4) Short description: The main activities in the public procurement are:
Activity 1 – Design and construction control and management;
Activity 2 – Review and coordination of the project documentation and preparation of Report/s for assessing the conformity of the technical. projects (incl. provided assessment of the "Constructive" part according to Article 142, Paragraph 10 of the ZUT);
Activity 3 – Preparatory activities before starting construction;
Activity 4–Executing a build. supervision during construction. as well as the activities under Art. 166, paragraph 1, item 2 of the ZUT (concerning inspection and control of the delivered and put into construction construction products) and under Art. 176b of the ZUT (drafting of Technical Passport/s);
Activity 5 – Closing activities
II.2.7) Duration of the contract, framework agreement or dynamic purchasing system: Duration in months: 24
II.2.13) Identification of the project: Funding will be provided under the Connecting Europe Facility (CEF) - Transport Sector under Agreement No. INEA/ CEF /TRAN/ M2014/1048809.