Print

Farim bridge
Details
Locations:Guinea-Bissau
Start Date:Feb 1, 2012
End Date:Jun 30, 2013
Sectors: Procurement Management, Research & Innovation, Roads & Bridges
Description
Economic Study and Technical Engineering Design for the construction of the Farim Bridge.
The design consists in the choice of the layout, the realization of surveys, a technical option choice between prestressed concrete or steel-concrete composite deck, the definition of static concept of the structure. The preliminary design will include a new
economic and environmental impact study. The final design will include all tender documents.
Services description:
Detailed Engineering Design of the structure, Topographic study, Geotechnical study, Geo-electrical study, Hydraulic and Hydrologic study, Preliminary dossier, Technical-economic feasibility study, Traffic study, Environmental Impact study; Final Design, Tender Dossier.
Name of Client: AGEOPPE.