Notice ID: 12405B24Q0398
Contract Award Number: 12405B24P0399
Description: Preventative Maintenance on Building 1 HVAC System
The Contractor must provide regular inspections, maintenance, and adjustments to the system to maintain its efficiency and reliability in strict accordance as detailed in attached Statement of Work (SOW). This includes the performance of regular scheduled preventive maintenance:
Replace filters:
- Check belts
- Replace belts if necessary
- Clean condensate drains
- Grease bearings
- Check electrical connections
- Clean condenser coils on chiller bi-yearly
- Check refrigerant levels
- Check capacitors
- Clean evaporator coils
- Clean boiler burner yearly
- Clean boiler flame sensor and ignitor bi-yearly
- Clean boiler rock box bi-yearly
- Check units for proper operation
- The main components of the HVAC system include:
- One Trane Ascend Air-Cooled Chiller
- One Lochinvar Crest Condensing Boiler Model FBN7001
- Four Air Handling Units: York AHU-1 Model XTl-051X078-JAKA017A; York AHU-2 Model XTI-048X075-JALA017A; York AHU-3 Model AHXXX/8ESR22-0804-H 2.2-16EP; York AHU-4 Model XTO-045X048-EAJA017A
- Two Exhaust Fans: Greenheck Vektor Model VK-H-24-A100-X
- Hot Water Circulating Pumps