Design of a hydroelectric power plant (run-of-river plant, installed capacity: approx. 1,100 MW, head: approx. 27 m, design flow: 3,950 m³/s) consisting of a powerhouse, dam, overflow spillway, lock for navigation and timber industry, switchgear and fish ladder.

The feasibility study includes amongst others:

    electricity market study and rate study, economic and risk analysis
    review and evaluation of environmental impact study
    preparation of a project summary as basis for the negotiations with potential investors.

Client: Verbund-Austrian Hydro Power AG, CJSC “Boguchanskaya Hydro-Electric Power Station”.