Share
Print
NOTICE AT-A-GLANCE
Project ID: P179867
Project Title: Public and Municipal Renewable Energy Project
Country: Turkiye
Notice No: OP00246588
Notice Type: Request for Expression of Interest
Notice Status: Published
Borrower Bid Reference: PUMREP/WB/CS-FS-PV-01
Procurement Method: Consultant Qualification Selection
Language of Notice: English
Submission Deadline Date/Time: Oct 02, 2023 16:00
Published Date: 08-Sep-2023
Description: Feasibility Studies for Renewable Energy Installations Consultancy Services for Group -1
Details:
REPUBLIC OF TÜRKYE
MINISTRY OF ENVIRONMENT, URBANIZATION AND CLIMATE CHANGE (MOEUCC)
GENERAL DIRECTORATE OF CONSTRUCTION AFFAIRS (GDCA)
REQUEST FOR EXPRESSIONS OF INTEREST
(CONSULTING SERVICES – FIRMS SELECTION-CQS)
PUBLIC AND MUNICIPAL RENEWABLE ENERGY PROJECT
CONSULTANCY SERVICES FOR
PREPARATION OF FEASIBILTY STUDIES FOR RENEWABLE ENERGY FACILITIES IN CENTRAL GOVERNMENT BUILDINGS
Reference No: PUMREP/WB/CS-FS-PV 01
This request for expressions of interest follows the General Procurement Notice for this project that appeared in UNDB on July 17, 2023 with reference no WB OP00236889.
The Ministry of Environment, Urbanization and Climate Change has applied financing from the World Bank toward the cost of the Public and Municipal Renewable Energy Project (PUMREP) and intends to apply part of the proceeds for consulting services.
The General Directorate of Construction Affairs (“GDCA”) of the Ministry of Environment Ministry of Environment, Urbanization and Climate Change (MoEUCC) serves as the main implementing agency for the Project. A project implementation unit (PIU) has been established under GDCA to manage the activities related to the Project. The overall objective of PUMREP is to increase the use of renewable energy (RE) through self-generation in public facilities. The implementation period for the project is planned as 5 years.
Table 1 indicates the tasks to be provided under the scope of the consulting services (“the Services”).
Table 1: The Consultant’s Services
Task No |
Services to be provided for the subprojects given in Table 2 as specified in Terms of Reference (ToR) |
1 |
Project Inception and implementation planning; |
2 |
Analysis of existing grid and generation/demand profiles;
|
3 |
Solar resource assessment |
4 |
Economic and Financial Analysis |
5 |
Structural analysis |
6 |
Risk Analysis and Mitigation Plan |
7 |
Global Environmental Benefits |
8 |
Post-installation maintenance requirements and 1-year operational support program |
9 |
Feasibility studies for grid connected RE (+BESS) including initial environmental and social screening studies Preparation of sub-project specific ESMP/ESMP Checklists Preparation of Occupational Health and Safety (OHS) Plan depending on the projects’ type, site-specific common Stakeholder Engagement Plan (SEP) |
10 |
Assist Ministry with the bidding process |
Further details of tasks refer to ToR published in project web page; kamuenerji.csb.gov.tr.
Under the PUMREP/WB/CS-FS-PV 01 contract package above-mentioned tasks will be undertaken for forty-seven (47) facilities listed below in Kayseri, Sivas, Tokat, Yozgat, Amasya, Çorum, Sinop, Ordu, and Samsun.
Table 2: List of Facilities
No |
Institution |
Beneficiary |
City |
Total power (kW) committed in the contract |
Installation area (m2) |
Type of PV |
Self Consumption/ Year (KWh) |
||
1 |
Ministry of Environment Urbanizaton and Climate Change |
Kayseri Tapu Kadastro Genel Müdürlüü |
Kayseri |
1250,00 |
2240,00 |
Carpark |
345.527,00 |
||
2 |
Ministry of Interior |
Kayseri ncesu Kaymakaml |
Kayseri |
N/A |
400,00 |
Carpark |
31.519,00 |
||
3 |
University |
Kayseri Erciyes Universitesi |
Kayseri |
20000,00 |
14896,00 |
Land |
28.008.360,00 |
||
4 |
University |
Kayseri Universitesi |
Kayseri |
2818,00 |
16143,00 |
Land |
2.457.559,00 |
||
5 |
Ministry of Environment Urbanizaton and Climate Change |
Sivas l Müdürlüü |
Sivas |
444,00 |
1.800,00 |
Carpark |
254.803,00 |
||
6 |
Ministry of Youth and Sports |
Sivas Binali Yldrm Yerlekesi (Yldz Yurt Müdürlüü) |
Sivas |
4.218,00 |
46.800,00 |
Land |
1.908.361,35 |
||
7 |
Ministry of Interior |
Sivas Aknclar Kaymakaml |
Sivas |
96,00 |
5.158,00 |
Carpark |
65.752,00 |
||
8 |
Ministry of Interior |
Sivas Divrii Kaymakaml |
Sivas |
N/A |
N/A |
Carpark |
N/A |
||
9 |
Ministry of Interior |
Sivas mranl Kaymakaml |
Sivas |
N/A |
1.115,00 |
Carpark |
51.965,00 |
||
10 |
Ministry of Agriculture and Forest |
Sivas DS 19. Bölge Müdürlüü |
Sivas |
215,00 |
6.850,00 |
Carpark/Roof |
494.410,00 |
||
11 |
University |
Sivas Cumhuriyet Universitesi |
Sivas |
5.000,00 |
19.430,00 |
Land |
19.685.483,00 |
||
12 |
Ministry of Family And Social Services |
Tokat Aile Ve Sosyal Hizmetler l Müdürlüü |
Tokat |
630,00 |
1.463,00 |
Roof |
52.422,00 |
||
13 |
Ministry of Family And Social Services |
Tokat Huzurevi Müdürlüü |
Tokat |
630,00 |
1.000,00 |
Roof |
321.735,00 |
||
14 |
University |
Tokat Gaziosmanpaa Universitesi |
Tokat |
5.000,00 |
246.363,00 |
Land |
3.391.150,00 |
||
15 |
Ministry of Environment Urbanizaton and Climate Change |
Yozgat l Müdürlüü |
Yozgat |
150,00 |
1.200,00 |
Carpark |
79.600,00 |
||
16 |
Ministry of Environment Urbanizaton and Climate Change |
Yozgat Tapu Kadastro Genel Müdürlüü |
Yozgat |
258,00 |
900,00 |
Roof |
604.297,00 |
||
17 |
Ministry of Youth and Sports |
Yozgat Sürmeli Yurt Müdürlüü |
Yozgat |
9.600,00 |
8.000,00 |
Land |
191.071,40 |
||
18 |
University |
Yozgat Bozok Universitesi |
Yozgat |
2.718,00 |
5.357,00 |
Carpark |
3.592.763,00 |
||
No |
Institution |
Beneficiary |
City |
Total power (kW) committed in the contract |
Installation area (m2) |
Type of PV |
Self Consumption/ Year (KWh) |
||
1 |
Ministry of Environment Urbanizaton and Climate Change |
Amasya Tapu Kadastro Genel Müdürlüü |
Amasya |
240,00 |
700,00 |
Roof |
163.470,00 |
||
2 |
University |
Amasya Universitesi |
Amasya |
8.674,00 |
21.072,00 |
Land |
2.818.249,71 |
||
3 |
Ministry of Family and Social Services |
Çorum Engelsiz Yaam Merkezi |
Çorum |
246,00 |
1.000,00 |
Roof |
101.375,00 |
||
4 |
Ministry of Family and Social Services |
Çorum Huzurevi |
Çorum |
N/A |
875,00 |
Carpark |
190.821,00 |
||
5 |
University |
Çorum Hitit Universitesi |
Çorum |
7.168,00 |
9.517,00 |
Land/Roof |
2.132.000,00 |
||
6 |
Ministry of Youth and Sports |
Sinop Gençlik ve Spor l Müdürlüü/Seyyid Bilal Yurdu |
Sinop |
960,00 |
2.000,00 |
Land |
750.539,63 |
||
7 |
Ministry of Youth and Sports |
Sinop Gençlik ve Spor l Müdürlüü/Sinop Gençlik Merkezi |
Sinop |
240,00 |
1.500,00 |
Land |
362.378,62 |
||
8 |
Ministry of Youth and Sports |
Sinop Gençlik ve Spor l Müdürlüü/Sinop Merkez Spor Salonu |
Sinop |
750,00 |
800,00 |
Land |
258.800,53 |
||
9 |
Ministry of Youth and Sports |
Sinop Yurdu |
Sinop |
480,00 |
500,00 |
Roof |
538.357,65 |
||
10 |
University |
Sinop Universitesi |
Sinop |
6.208,00 |
N/A |
Carpark |
2.217.044,00 |
||
No |
Institution |
Beneficiary |
City |
Total power (kW) committed in the contract |
Installation area (m2) |
Type of PV |
Self Consumption/ Year (KWh) |
||
1 |
Ministry of Family and Social Services |
Ordu Fatsa Huzurevi Müdürlüü |
Ordu |
N/A |
20.185,00 |
Roof |
107.976,00 |
||
2 |
Ministry of Environment Urbanization and Climate Change |
Ordu Tapu Kadastro Genel Müdürlüü |
Ordu |
291,00 |
950,00 |
Carpark |
144.188,00 |
||
3 |
Ministry of Interior |
Ordu Akku Kaymakamlii |
Ordu |
N/A |
512,00 |
Roof |
54.295,00 |
||
4 |
Ministry of Interior |
Ordu Valilii |
Ordu |
1.425,00 |
7.365,00 |
Carpark/Roof |
N/A |
||
5 |
University |
Ordu Universitesi |
Ordu |
960,00 |
17.680,00 |
Carpark |
3.525.000,00 |
||
6 |
Ministry of Justice |
Samsun Adalet Saray |
Samsun |
N/A |
5.000,00 |
Roof |
2.710.000,00 |
||
7 |
Ministry of Labour |
Samsun Sosyal Güvenlik Il Müdürlüü |
Samsun |
1.000,00 |
2.400,00 |
Roof |
696.219,00 |
||
8 |
Ministry of Youth and Sports |
Samsun Alaçam Yurt Müdürlüü |
Samsun |
630,00 |
690,00 |
Roof |
181.637,00 |
||
9 |
Ministry of Treasury and Finance |
Samsun Vergi Dairesi Bakanl |
Samsun |
985,00 |
960,00 |
Roof |
571.500,00 |
||
10 |
Ministry of Interior |
Samsun 19 Mays Kaymakamlii |
Samsun |
87,00 |
1.500,00 |
Carpark |
98.985,00 |
||
11 |
Ministry of Interior |
Samsun Alaçam Kaymakaml |
Samsun |
400,00 |
500,00 |
Roof |
156.351,00 |
||
12 |
Ministry of Interior |
Samsun Asarcik Kaymakaml |
Samsun |
160,00 |
1.000,00 |
Carpark/Roof |
140.291,00 |
||
13 |
Ministry of Interior |
Samsun Ilkadim Kaymakaml |
Samsun |
400,00 |
680,00 |
Carpark |
133.315,00 |
||
14 |
Ministry of Interior |
Samsun Salpazar Kaymakamlii |
Samsun |
96,00 |
750,00 |
Carpark |
74.500,00 |
||
15 |
Ministry of Health |
Samsun Bafra Devlet Hastanesi |
Samsun |
N/A |
14.000,00 |
Carpark |
7.304.000,00 |
||
16 |
Ministry of Agriculture and Forest |
Samsun Karadeniz Tarmsal Aratrmalar Enstitüsü Müdürlüü |
Samsun |
250,00 |
1.500,00 |
Roof |
423.489,00 |
||
17 |
Ministry of Trade |
Samsun Orta Karadeniz Gümrük ve D Ticaret Bölge Müdürlüü |
Samsun |
630,00 |
1.000,00 |
Roof |
216.758,00 |
||
18 |
University |
Samsun On Dokuz Mayis Universitesi |
Samsun |
28.000,00 |
122.740,00 |
Land/Carpark |
29.073.504,00 |
||
19 |
University |
Samsun Universitesi |
Samsun |
1.817,00 |
30.000,00 |
Land |
730.000,00 |
||
The estimated duration for the Services listed in Table 1 is envisaged as 6 months in total.
The detailed Terms of References (TORs) for the Services can be found at the following web page address: https://kamuenerji.csb.gov.tr/
The General Directorate of Construction Affairs (GDCA) now invites eligible consulting firms to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.
The qualification requirements are;
Note: Key Experts will not be evaluated at the shortlisting stage.
Note: GDCA reserves sole right to request Consultant for verification of any submitted document/information in accordance with the applicable Law.
The attention of interested Consultants is drawn to paragraphs 3.14, 3.16, and 3.17 of the World Bank’s Procurement Regulations for IPF Borrowers November 2020 (“Procurement Regulations”) setting forth the World Bank’s policy on conflict of interest.
Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture should have a legal entity and shall be jointly and severally liable for the entire contract, if selected. Interested consultants should clearly indicate the structure of their “association” and the duties of the partners and sub-consultants in their application. Unclear expression of interests in terms of “in association with” and/or “in affiliation with” and etc. may not be evaluated. Consultants shall submit only one EOI either individually as a single consultant or as a partner in a joint venture. Consultants may associate with more than one firm or joint venture in the capacity of a sub-consultant. No firm can be a sub-consultant while submitting an EOI individually as a firm or as a partner of a joint venture. Sub-consultants’ experience will not contribute in evaluating the experience of the interested single consultant or joint venture. Sub-consultants’ qualifications and experience will only be considered in evaluating the personnel capacity of the interested single consultant or joint venture.
A Consultant will be selected in accordance with the Consultant’s Qualification-based Selection (CQS) method described in the Procurement Regulations and to be specifically set out in the Request for Proposals.
Further information can be obtained at the address below from 10.00 a.m. to 5:00 p.m. (Turkey Local Time).
Expressions of interest to be clearly marked as:
“Assignment Title: CONSULTANCY SERVICES FOR PREPARATION OF FEASIBILITY STUDIES FOR RENEWABLE ENERGY FACILITIES IN CENTRAL GOVERNMENT BUILDINGS (Group-1)” Reference No: PUMREP/WB/CS-FS-PV 01
and shall be delivered in a sealed envelope; 1 (one) printed original signed hard-copy, and 2 (two) PDF electronic copies (one signed scanned copy and one digital copy directly converted from Word format) in a USB drive, to the address below in person together with a cover letter (template for cover letter is below) including the necessary qualification documents, name, address, phone and e-mail address of the company, no later than 02/10/2023 at 16.00 (Turkey Local Time). The submission shall be done by hand. Applications sent by e-mail, fax, or mail shall not be considered for evaluation. (It is recommended to arrive at least 30 minutes before the application time, since the cover letter must be entered into the document registration system.)
To:
Ministry of Environment, Urbanization and Climate Change
General Directorate of Construction Affairs
External Investments Department
Attn: Esra TURAN TOMBAK (Project Director)
Adress:
Mustafa Kemal Mahallesi, 2082. Cadde, No:52, 06510
Çankaya / ANKARA
For information:
Tel: 0312 480 07 50
E-mail: ihale.dky@csb.gov.tr
web-site: https://www.kamuenerji.csb.gov.tr
Cover Letter Template
……/…../2023
T.C. ÇEVRE, EHIRCILIK VE KLM DEIIKLII BAKANLII
(Yap leri Genel Müdürlüüne)
(D Kaynakl Yatrmlar Daire Bakanl)
Dünya Bankas Finansmanl Türkiye Kamu ve Belediye Yenilenebilir Enerji Projesi kapsamnda aada bilgileri bulunan ve iaretlenen i için teklif dosyamz iliikte bilgilerinize arz ederim.
Consultancy Services for Preparation of Feasibility Studies for Renewable Energy Facilities in Central Government Buildings Feasibility Studies and Conducting Environmental and Social Screening Studies
Reference No: PUMREP/WB/CS-FS-PV 01
Ek: Teklif Dosyas (Kapal Zarf içinde)
[mza:
sim:
Soyisim:
Unvan:
Firma Ad:]
CONTACT INFORMATION
Organization/Department: Ministry of Environment and Urbanization GDCS
Name: Esra Turan Tombak
Address: Mustafa Kemal Mahallesi, 2082. Cadde, No:52, 06510 Çankaya / ANKARA
City:
Province/State:
Postal Code:
Country: Turkiye
Phone: +90 312 480 07 50
Email: esra.tombak@csb.gov.tr
Website: https://www.kamuenerji.csb.gov.tr