Loan No.: 49329-007 BAN

Executing Agency: Khulna Water Supply and Sewerage Authority

Contract number: KWASA/KSSDP/CS-1

Contract name: Project Management and Supervision Consultant

Description: The main objective of this consultancy services is to support KWASA to implement sewerage system development project for improving sewerage and sanitation service with necessary interventions envisaged to be implemented at Khulna city & Batiaghata Upazila. The services will include construction supervision, technical guidance having gone through the all related documents, correction or addition, if it is deemed necessary during implementation considering the field situation, support to bidding process for supply packages and implementation, monitoring of safeguard requirements as per ADB safeguard policy and other safeguards requirements followed in the intervention areas, and preparation of reports & documents as required.
The specific objectives of the consultancy services are to support KWASA in the following:
a) To supervise the construction of infrastructures and Installation of electro-mechanical equipment under all the subprojects;
b) To monitor the progress of construction work and guide the contractor to complete the work as per schedule;
c) To ensure the ADB’s safeguard compliance;
d) To go through the design, drawing and estimate of all the components and sub-components of sewerage system (sewer network, treatment plant, pumping station & others) and to correct the documents, in consultation with KWASA, if requires during implementation;
e) To prepare the bidding document (for remaining package, such as, sewer cleaning equipment, laboratory equipment, office equipment and operational vehicles etc.); and
f) To support KWASA to conduct the bidding procedure and award of contract in accordance with the PPR 2008 and ADB’s Policy and Regulation, 2017 and as amended time to time, and in resolving contract related issues during implementation;