23 January 2025
EVALUATION results Call LIFE-2024-CET:
Published: 18.04.2024
Deadline: 19.09.2024
Available budget: EUR 81 250 000
Topic code |
Call topic |
Budget |
LIFE-2024-CET-RENOPUB |
Facilitation structures for the renovation of public buildings |
3,5 M EUR |
The results of the evaluation for each topic are as follows:
Call LIFE-2024-CET-RENOPUB:
Number of proposals submitted (including proposals transferred from or to other calls): 14
Number of inadmissible proposals: 0
Number of ineligible proposals: 0
Number of above-threshold proposals: 6
Total budget requested for above-threshold proposals: EUR 7.882.489,95
Number of proposals retained for funding: 2
Number of proposals in the reserve list: 4
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact CINEA-LIFE-CET@ec.europa.eu.
23 September 2024
Call LIFE-2024-CET has closed on 19 September 2024.
310 proposals have been submitted.
The breakdown per topic is:
LIFE-2024-CET-RENOPUB: 14 proposals
Evaluation results are expected to be communicated in February 2025.
TOPIC ID: LIFE-2024-CET-RENOPUB
Type of grant: Call for proposals
General information
Programme: Programme for Environment and Climate Action (LIFE)
Call: LIFE Clean Energy Transition (LIFE-2024-CET)
Type of action: LIFE-PJG LIFE Project Grants
Type of MGA: LIFE Action Grant Budget-Based [LIFE-AG]
Status: Open for submission
Deadline model: single-stage
Opening Date: 18 April 2024
Deadline dates: 19 September 2024 17:00 (Brussels time)
Topic description
Objective:
The public sector plays a key role in delivering the energy transition, with a unique mandate over their public assets and a unique convening power on actors across the value chain. The European Green Deal’s Renovation Wave[1] aims to double the renovation rate of buildings by 2030, which requires also massive investment into the public building stock. In line with the REPowerEU plan[2] to phase out EU dependence on fossil fuel imports, the public sector is called to play a key role in reducing its energy consumption through building renovations. The revised Energy Efficiency Directive (EED)[3] requires the public sector at local, regional and national levels to reduce their total final energy consumption by 1.9% annually and to renovate at least 3% of the total floor area of their heated and/or cooled buildings annually, which should be transformed into at least nearly zero-energy buildings (nZEB) or zero-emission buildings (ZEB).
Currently, a substantial barrier to increased renovation rates in the public sector is to create and sustain in the long-term the financial and technical capacity amongst public authorities to develop projects. In particular, small and medium-sized municipalities often do not have sufficient resources to dedicate staff towards developing a project pipeline.
The challenge remains to upscale renovations of public buildings to nZEB or ZEB standards and to demonstrate the exemplary role of the public authorities in decarbonising their assets and leading the way towards the European clean energy transition. Hence, facilitation structures (e.g. one-stop-shops or similar) are needed at regional and national levels that can support a larger number of public project promoters in designing and delivering ambitious renovation projects in the public sector at scale and capitalising on existing solutions. The experience from the technical assistance facilities (ELENA, H2020 PDA, eee-f) has shown that a range of competences are needed in public project promoters to bring sustainable energy projects alive, namely expertise in technical aspects (energy audits, project design), financial engineering (Energy Performance Contracts, blending different finance sources) and legal aspects (bundling, pooling, procurement, applying Energy Performance Contracts).
Scope:
Proposals should establish and operate regional/national facilitation structures, for example one-stop-shops, to accelerate the renovation wave in the public sector (e.g. office buildings, social housing, schools, leisure facilities etc.) covering a larger territory and offering to public authorities a comprehensive, all-inclusive service from technical, financial to legal advice, procurement and quality assurance of works.
Actions should clearly focus on the ambitious energy renovation of existing public buildings (e.g. administrative buildings, hospitals, schools) to nZEB or ZEB standards, and should target legal entities operating under public law (e.g. public authorities, public bodies, social/public rental housing operators, etc.) as the main final beneficiaries of the services to be put in place.
Proposals should describe the services that will be developed and offered to public authorities, which should include:
Proposals should clearly describe how they will achieve long-term sustainability of the facilitation structure. For example, this could include a clear outline of a sustainability strategy, business plan and/or dedicated tasks in the proposed work plan to that effect.
Proposals may be submitted by a single applicant or by applicants from a single eligible country.
The Commission considers that proposals requesting a contribution from the EU of a range of EUR 1 million to EUR 1.5 million would allow the specific objectives to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.
Expected Impact:
Proposals submitted under this topic should present the concrete results which will be delivered by the activities, and demonstrate how these results will contribute to the topic-specific impacts. This demonstration should include a detailed analysis of the starting point and a set of well-substantiated assumptions, and establish clear causality links between the results and the expected impacts.
Proposals should result in long-term facilitation structures which are tested, implemented and operational at the end of the action, i.e. delivering renovation projects to nZEB and ZEB standards.
Proposals should quantify their impacts using the indicators listed below, where relevant, as well as other project-specific performance indicators:
All proposals submitted under this topic should also quantify their impacts related to the following common indicators for the LIFE Clean Energy Transition subprogramme:
The impacts of the proposals should be demonstrated during the project and within 5 years after the project lifetime.
[1]Communication from the Commission to the European Parliament, the European Council, the European Economic and Social Committee and the Committee of Regions, A Renovation Wave for Europe - greening our buildings, creating jobs, improving lives, COM(2020) 662 final.
[2]Communication from the Commission of 8.3.2022 to the European Parliament, the European Council, the European Economic and Social Committee and the Committee of the Regions, REPowerEU: Joint European Action for more affordable, secure and sustainable energy, COM(2022)108 final.
[3]Directive (EU) 2023/1791 of the European Parliament and of the Council of 13 September 2023 on energy efficiency and amending Regulation (EU) 2023/955 (recast).
Conditions
1.Admissibility conditions: described in section 5 of the call document
Proposal page limits and layout:described in Part B of the Application Form available in the Submission System and in section 5 of thecall document
2. Eligible countries:described in section 6 of of the call document
3. Other eligibility conditions:described in section 6 of the call document
For topics LIFE-2024-CET-OSS, LIFE-2024-CET-RENOPUB, LIFE-2024-CET-PDA and LIFE-2024-CET-SAP: proposals must be submitted by at least one applicant from an eligible country.
For all topics, the coordinator must be established in an eligible country.
4. Financial and operational capacity and exclusion:described insection 7 of the call document
5.Evaluation and award:
6. Legal and financial set-up of the grants:describedin section 10 of the call document
Start submission
To access the Electronic Submission Service, please click on the submission-button next to the type of action and the type of model grant agreement that corresponds to your proposal. You will then be asked to confirm your choice, as it cannot be changed in the submission system. Upon confirmation, you will be linked to the correct entry point.
To access existing draft proposals for this topic, please login to the Funding & Tenders Portal and select the My Proposals page of the My Area section.
Get support
Please read carefully all provisions below before the preparation of your application.
We want to draw your attention to the possibility to get support from your National Contact Point(NCP).
Funding & Tenders Portal FAQ– Submission of proposals.
IT Helpdesk– Contact the IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc.
Online Manual– Step-by-step online guide through the Portal processes from proposal preparation and submission to reporting on your on-going project. Valid for all 2021-2027 programmes.