Horizon Europe (2021 - 2027)

Smart use of geothermal electricity and heating and cooling in the energy system

Last update: May 8, 2024 Last update: May 8, 2024

Details

Location:EU 27EU 27
Contracting Authority Type: Development Institution
Status:Awarded
Budget: EUR 15,000,000
Award ceiling: N/A
Award floor: N/A
Sector:Energy, Electrical Engineering, Heating
Languages:English
Eligible applicants:Unrestricted / Unspecified
Eligible nationalities:Afghanistan, Albania, Algeria, A ... See more Afghanistan, Albania, Algeria, Angola, Argentina, Armenia, Aruba, Austria, Azerbaijan, Bangladesh, Belarus, Belgium, Belize, Benin, Bhutan, Bolivia, Bosnia and Herzegovina, Botswana, Bulgaria, Burkina Faso, Burundi, Cambodia, Cameroon, Cape Verde, Central African Republic, Chad, Colombia, Comoros, Congo, Costa Rica, Cote d'Ivoire, Croatia, Cuba, Curaçao, Cyprus, Czech Republic, Dem. Rep. Congo, Denmark, Djibouti, Dominica, Commonwealth of, Dominican Republic, Ecuador, Egypt, El Salvador, Equatorial Guinea, Eritrea, Estonia, Eswatini (Swaziland), Ethiopia, Faroe Islands, Fiji, Finland, France, French Polynesia, French Southern Territory, Gabon, Gambia, Georgia, Germany, Ghana, Greece, Greenland, Grenada, Guatemala, Guinea, Guinea-Bissau, Guyana, Haiti, Honduras, Hungary, Iceland, Indonesia, Iran, Iraq, Ireland, Israel, Italy, Jamaica, Jordan, Kazakhstan, Kenya, Kiribati, Kosovo, Kyrgyzstan, Laos, Latvia, Lebanon, Lesotho, Liberia, Libya, Lithuania, Luxembourg, Madagascar, Malawi, Malaysia, Maldives, Mali, Malta, Marshall Islands, Mauritania, Mauritius, Micronesia, Moldova, Mongolia, Montenegro, Mozambique, Myanmar, Namibia, Nepal, Netherlands, New Caledonia, Nicaragua, Niger, Nigeria, North Korea, North Macedonia, Norway, Pakistan, Palestine / West Bank & Gaza, Papua New Guinea, Paraguay, Peru, Philippines, Poland, Portugal, Romania, Rwanda, Saint Lucia, Saint Martin, Saint Vincent and the Grenadines, Samoa, Sao Tome and Principe, Senegal, Serbia, Sierra Leone, Slovakia, Slovenia, Spain, St. Pierre and Miquelon, Sudan, Suriname, Sweden, Syria, Tajikistan, Tanzania, Thailand, Timor-Leste, Togo, Tonga, Tunisia, Turkey, Turkmenistan, Tuvalu, Uganda, Ukraine, Uzbekistan, Vanuatu, Venezuela, Vietnam, Wallis and Futuna, Yemen, Zambia, Zimbabwe
Date posted: Dec 9, 2022

Attachments 2

Description

Call updates

Sep 5, 2023 5:47:46 PM

The call for proposals HORIZON-CL5-2023-D3-02 closed on 05/09/2023. 299 proposals were submitted to the call. The breakdown per topic is:

 

HORIZON-CL5-2023-D3-02-06    (IA): 5 proposals

 


 

May 8, 2023 11:29:50 AM

The submission session is now available for: HORIZON-CL5-2023-D3-02-06(HORIZON-IA)


Smart use of geothermal electricity and heating and cooling in the energy system

TOPIC ID: HORIZON-CL5-2023-D3-02-06

Programme: Horizon Europe Framework Programme (HORIZON)
Call: Sustainable, secure and competitive energy supply (HORIZON-CL5-2023-D3-02)
Type of action: HORIZON-IA HORIZON Innovation Actions
Type of MGA: HORIZON Action Grant Budget-Based [HORIZON-AG]
Deadline model: single-stage
Planned opening date: 04 May 2023
Deadline date: 05 September 2023 17:00:00 Brussels time

Topic description
 
ExpectedOutcome:

Geothermal as backbone of a heating grid including geological thermal storage facilities as system support. Project results are expected to contribute to all of the following expected outcomes:

  • Geothermal energy will be widely deployed and competitively priced, underpinned with reduced capital, operational and maintenance costs. Geothermal and geological thermal storage facilities as support system will be a backbone of the heating grid .
  • Improved system integration of geothermal heat and power plants coping with changing demand for electricity, heat and cooling and intermittent renewable power generation.
  • Enhanced operation flexibility of a geothermal heat and power plant by improving substantially key performance indicators: ramp rate & start-up time, power & heat operation range, overload capability.
  • Implementation of smart control system aiming at optimizing plant operation by taking into account various control parameters (current and anticipated) such as demand (power & heat), price signals, flexibility of demand, ancillary grid services, renewable generation, etc.
Scope:

Projects are expected to:

  • Demonstrate the technical and economic feasibility of responding to commands from a grid or network operator, at any time, to increase or decrease output ramp up and down. -demonstrate the automatic generation control (load following / ride-through capabilities to grid specifications) and ancillary services of geothermal power plants Address flexible heating and/or cooling supplied from binary cycles or EGS plants, including coupling with renewable energy sources.
  • Increase variable demand of heating, cooling and electricity by integration of adequate installations and equipment such as heat pumps, energy piles, energy sheet pile walls, ORC turbo-expanders, heat exchanger networks, hot and cold reservoirs (e.g. geothermal storage, UTES).

Actions are expected to consider the development of transmission and distribution infrastructure, and the interplay with other flexibility options (e.g. demand-side management and storage), and test on dispatchability leading to AI-based smart thermal grids balancing generation and demand. The flexible generation should be able to provide additional services to the grid such as inertial services/peak power, role in electricity balancing/reserve market. Projects should integrate increased diagnostics on components for performance/reliability monitoring (maintaining high level of heat transfer – durability, fouling issues…).

Plans for the exploitation and dissemination of results for proposals submitted under this topic should include a strong business case and sound exploitation strategy, as outlined in the introduction to this Destination. The exploitation plans should include preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan, financial model) indicating the possible funding sources to be potentially used (in particular the Innovation Fund).

Specific Topic Conditions:

Activities are expected to achieve TRL 7 by the end of the project – see General Annex B.

Want to unlock full information?
Member-only information. Become a member to access this information. Procurement notices from over 112+ donors and banks are available here
Learn more about our membership benefits