Horizon Europe (2021 - 2027)

Innovative components and configurations for heat pumps

Last update: Apr 30, 2024 Last update: Apr 30, 2024

Details

Location:EU 27EU 27
Contracting Authority Type: Development Institution
Status:Awarded
Budget: EUR 6,000,000
Award ceiling: N/A
Award floor: N/A
Sector:Heating
Languages:English
Eligible applicants:Unrestricted / Unspecified
Eligible nationalities:Afghanistan, Albania, Algeria, A ... See more Afghanistan, Albania, Algeria, Angola, Argentina, Armenia, Aruba, Austria, Azerbaijan, Bangladesh, Belarus, Belgium, Belize, Benin, Bhutan, Bolivia, Bosnia and Herzegovina, Botswana, Bulgaria, Burkina Faso, Burundi, Cambodia, Cameroon, Cape Verde, Central African Republic, Chad, Colombia, Comoros, Congo, Costa Rica, Cote d'Ivoire, Croatia, Cuba, Curaçao, Cyprus, Czech Republic, Dem. Rep. Congo, Denmark, Djibouti, Dominica, Commonwealth of, Dominican Republic, Ecuador, Egypt, El Salvador, Equatorial Guinea, Eritrea, Estonia, Eswatini (Swaziland), Ethiopia, Faroe Islands, Fiji, Finland, France, French Polynesia, French Southern Territory, Gabon, Gambia, Georgia, Germany, Ghana, Greece, Greenland, Grenada, Guatemala, Guinea, Guinea-Bissau, Guyana, Haiti, Honduras, Hungary, Iceland, Indonesia, Iran, Iraq, Ireland, Israel, Italy, Jamaica, Jordan, Kazakhstan, Kenya, Kiribati, Kosovo, Kyrgyzstan, Laos, Latvia, Lebanon, Lesotho, Liberia, Libya, Lithuania, Luxembourg, Madagascar, Malawi, Malaysia, Maldives, Mali, Malta, Marshall Islands, Mauritania, Mauritius, Micronesia, Moldova, Mongolia, Montenegro, Mozambique, Myanmar, Namibia, Nepal, Netherlands, New Caledonia, Nicaragua, Niger, Nigeria, North Korea, North Macedonia, Norway, Pakistan, Palestine / West Bank & Gaza, Papua New Guinea, Paraguay, Peru, Philippines, Poland, Portugal, Romania, Rwanda, Saint Lucia, Saint Martin, Saint Vincent and the Grenadines, Samoa, Sao Tome and Principe, Senegal, Serbia, Sierra Leone, Slovakia, Slovenia, Spain, St. Pierre and Miquelon, Sudan, Suriname, Sweden, Syria, Tajikistan, Tanzania, Thailand, Timor-Leste, Togo, Tonga, Tunisia, Turkey, Turkmenistan, Tuvalu, Uganda, Ukraine, Uzbekistan, Vanuatu, Venezuela, Vietnam, Wallis and Futuna, Yemen, Zambia, Zimbabwe
Date posted: Dec 9, 2022

Attachments 2

Description

Call updates

Sep 5, 2023 5:47:46 PM

The call for proposals HORIZON-CL5-2023-D3-02 closed on 05/09/2023. 299 proposals were submitted to the call. The breakdown per topic is:

 

HORIZON-CL5-2023-D3-02-04    (RIA): 22 proposals

 


 

May 8, 2023 11:29:50 AM

The submission session is now available for: HORIZON-CL5-2023-D3-02-04(HORIZON-RIA)


Innovative components and configurations for heat pumps

TOPIC ID: HORIZON-CL5-2023-D3-02-04

Programme: Horizon Europe Framework Programme (HORIZON)
Call: Sustainable, secure and competitive energy supply (HORIZON-CL5-2023-D3-02)
Type of action: HORIZON-RIA HORIZON Research and Innovation Actions
Type of MGA: HORIZON Action Grant Budget-Based [HORIZON-AG]
Deadline model: single-stage
Planned opening date: 04 May 2023
Deadline date: 05 September 2023 17:00:00 Brussels time

Topic description
 
ExpectedOutcome:

Project results are expected to contribute to some of the following expected outcomes:

  • Improved performance of heat pumps and/or heat pump components.
  • Reduced environmental footprint of heat pumps and/or heat pump components.
  • Reduced greenhouse gas emissions.
  • Enhanced energy system integration.
Scope:

Support will be given to develop innovative heat pumps and/or heat pump components. The innovative heat pumps and/or heat pump components should be more efficient and more reliable than current commercial solutions. They should be safe and affordable.

The proposal should assess and optimize the requirements in terms of materials needed to produce the heat pumps and/or heat pump components.

Applicants should apply a ‘circularity by design’ approach and assess the sustainability of the proposed solutions from a life cycle perspective. Among others, they should estimate the carbon footprint expressed in gCO2e/kWh of heat and/or cold delivered.

The requirements of the final users and/or installers should be properly assessed (e.g., in terms of 'plug-and-play' installation, day-to-day operation, maintenance, space requirements, noise, integration with networks and/or other devices, demand response capability, etc.).

Proposals investigating heat pumps with a capacity >12 kW are expected to use refrigerants with 100-year Global Warming Potential (GWP) < 150 (timeframe based on the Fourth Assessment Report of the Intergovernmental Panel on Climate Change (IPCC)).

Proposals should consider standardisation activities as part of their R&I approach, with a view to bringing their technologies closer to the market.

Specific Topic Conditions:

Activities are expected to achieve TRL 4-5 by the end of the project – see General Annex B.

Want to unlock full information?
Member-only information. Become a member to access this information. Procurement notices from over 112+ donors and banks are available here
Learn more about our membership benefits