Share
Print
Call updates
Oct 12, 2023 10:54:24 AM
The call for proposals HORIZON-CL5-2023-D3-03 closed on 10/10/2023. 88 proposals were submitted to the call. The breakdown per topic is:
HORIZON-CL5-2023-D3-03-01 (RIA): 17 proposals
May 8, 2023 11:38:40 AM
The submission session is now available for: HORIZON-CL5-2023-D3-03-01(HORIZON-RIA)
Increasing the efficiency of innovative static energy conversion devices for electricity and heat/cold generation
TOPIC ID: HORIZON-CL5-2023-D3-03-01
Programme: Horizon Europe Framework Programme (HORIZON)
Call: Sustainable, secure and competitive energy supply (HORIZON-CL5-2023-D3-03)
Type of action: HORIZON-RIA HORIZON Research and Innovation Actions
Type of MGA: HORIZON Action Grant Budget-Based [HORIZON-AG]
Deadline model: single-stage
Planned opening date: 04 May 2023
Deadline date: 10 October 2023 17:00:00 Brussels time
Projects are expected to develop further the harvesting of renewable energy in areas/conditions where other conversion systems are less efficient, less convenient or not possible.
The results are expected to contribute to at least three of the outcomes in A and B:
A. Increased potential for wider application of electricity and heat/cold static generators due to increased efficiency of energy conversion devices using physical effects such as:
B. Optimised construction and application of the above-mentioned devices for:
Projects are expected to implement both the activities in (1) and the validation/demonstration in (2) for the technologies listed above addressed individually and/or as combination of them or with other generation technologies (e.g., Thermionic Photovoltaic TIPV) as described below:
1. Development of at least three of the above-mentioned technologies involving the activities listed below. These can be complemented among them and/or with others pertinent to the topic.
2. Validation/demonstration of the activities developed in (1) with at least one pilot for each technology in different EU Member States/Associated Countries.
Specific Topic Conditions:Activities are expected to achieve TRL 5-6 by the end of the project – see General Annex B.