Share
Print
Consulting services for the design of the layout of a 9 km long reclaimed water pipeline and the realization of an Environmental and Social Impact Assessment (ESIA) and an Environmental and social Management Plan (ESMP) for the construction of two decentralized water treatment plants and treatment systems in the locations of Zone A of Barbados.
The plan should be able to serve as a basis for the preparation of technical specifications for possible future related public tender processes, it should be sufficiently detailed to allow the realization of a complete ESIA.
PROFILE REQUIREMENT
* Open Tenders for Individual Consultants.