Lead high-impact, climate-resilient healthcare infrastructure construction in Tonga, overseeing field operations, quality assurance, and compliance for the Prince Wellington Ngu Hospital redevelopment in Vava'u.
To address the growing burden of non-communicable diseases (NCDs) and improve healthcare access in outer island communities, the Government of Tonga (GoT) is implementing the Health Enhancement and Resiliency in Tonga (HEART) Project (P180965). Financed by a World Bank grant the project seeks to build climate-resilient health infrastructure and strengthen service delivery across the Kingdom, specifically focusing on the Vava'u and Niuas Island groups.
A dedicated Project Management Unit (PMU) has been established within the Ministry of Health (MoH) in Nuku'alofa to lead day-to-day project management, coordination, and execution. Under Component 2 of the project—Strengthening the accessibility of resilient health services—the primary objective is to redevelop, rehabilitate, and equip the Prince Wellington Ngu Hospital (PWNH) in Neiafu, Vava'u. Servicing a catchment population of approximately 15,000 residents and supporting decentralized clinics across the Northern Islands, the redevelopment includes constructing a new, climate-resilient hospital facility (approx. 2,500–6,000 sqm, USD 15–25M estimated budget) designed to Importance Level 4 (IL4) standards, upgrading staff quarters, and modernizing medical equipment and health waste management systems.
UNOPS Embedded Technical Support & Role of Lead Civil Engineer
Recognizing the technical complexity of managing multi-phase hospital redevelopment on an operational site, combined with severe site constraints, high logistics costs, and geographic isolation in Vava'u, the Ministry of Health partnered with UNOPS to augment PMU capacity. UNOPS provides dedicated technical assistance, contract management, design review oversight, and quality assurance under Component 2.
The Lead Civil Engineer will serve as an embedded technical support resource based in PMU/MoH in Tongatapu. During the phase 1 & 2, the National Engineer will travel up to 10% of the National Engineer’s Time is expected to be spent on Vava’u based on requirements identified by PMU/MoH. and up to 50% during construction (phase 3) in the field to provide on-site supervision and technical oversight. Reporting directly to the UNOPS Project Manager, the incumbent during Phase 1 and Phase 2, will focus on providing technical support and coordinating with the PMU/MoH on design reviews, technical assessments, and procurement readiness and during the construction phase,daily field-level supervision, monitor contractor compliance with World Bank Environmental and Social Framework (ESF) standards, alignment with UNOPS Health and Safety requirements, meeting the Quality Management Plan (QA/QC activities), track technical submittals, manage local site constraints, and act as a vital technical link between the contractor(s), site team, local authorities, and the PMU-MoH.
The incumbent will exercise professional judgement and independence in carrying out assigned technical responsibilities, while reporting to the UNOPS Project Manager and working closely with the PMU. Formal design responsibility, contractual construction supervision, certification, and contract administration shall remain with the designated parties under the applicable contracts and project arrangements.
Reporting to the Project Managers (UNOPS PM and MoH/PMU), the incumbent is responsible for:
1. Design Phase Coordination and Quality Assurance
- Coordinate and monitor the progress and quality of design deliverables, ensuring alignment with project requirements, applicable standards, and agreed timelines.
- Review assigned engineering deliverables, identify technical gaps, and provide recommendations to the Project Manager (UNOPS) and PMU.
- Coordinate UNOPS design review activities, consolidate technical comments, and work with the D&S Consultant to facilitate timely resolution of outstanding issues.
- Contribute to the development and refinement of the design brief and technical requirements in coordination with the Project Manager (UNOPS), PMU, and D&S Consultant.
2. Field-Based Construction Monitoring and Quality Assurance
- Undertake independent technical monitoring and site inspections of construction and retrofit works at PWNH to verify compliance with approved designs, specifications, and quality requirements.
- Monitor the D&S Consultant's construction supervision and QA/QC activities, identify deficiencies, and recommend corrective measures.
- Provide technical advice on construction methodologies, workmanship, materials, and site-related engineering issues.
3. Construction Progress, Cost and Risk Monitoring
- Monitor construction progress against approved schedules, identify potential delays, logistical constraints, and contractor performance risks, and recommend mitigation measures.
- Review technical aspects of BoQ quantities, progress measurements, variations, and payment documentation following verification by the D&S Consultant.
- Assess site-specific challenges relating to material supply, workforce availability, transportation, and construction logistics in Vava'u.
4. Stakeholder Liaison and Technical Coordination
- Serve as a technical focal point for coordination with the PMU, hospital management, local authorities, D&S Consultant, and relevant stakeholders.
- Facilitate technical discussions and resolution of site-related issues, ensuring appropriate coordination and escalation to the Project Manager (UNOPS).
- Coordinate technical inputs from UNOPS specialist retainers and other engineering experts.
5. Health, Safety, Environmental and Sustainability Compliance
- Monitor implementation of applicable UNOPS HSSE requirements, World Bank Environmental and Social Framework (ESF) provisions, and project-specific safeguards.
- Review relevant quality, health and safety, and environmental management arrangements, and recommend corrective actions where deficiencies are identified.
- Monitor technical compliance with applicable Importance Level 4 (IL4), IFC EDGE Level 2, and Building Resilience Index (BRI) AA project requirements.
- Support the integration of GEDSI considerations and relevant community health and safety measures into construction activities.
6. Medical Equipment and Utilities Interface Coordination
- Coordinate technical interfaces between civil works, building services, medical equipment installations, and supporting infrastructure.
- Identify potential design or construction interface conflicts and facilitate their resolution with the D&S Consultant and relevant specialists.
7. Testing, Commissioning and Handover
- Monitor testing, commissioning, and completion activities, ensuring outstanding technical deficiencies are identified and addressed.
- Review relevant as-built documentation, testing records, and handover submissions, providing technical recommendations to the Project Manager and PMU.
- Support technical inspections and follow-up of defects during the applicable Defects Notification Period.
8. Reporting, Documentation and Knowledge Sharing
- Prepare periodic technical progress reports, highlighting construction quality, engineering risks, consultant and contractor performance, and recommended actions.
- Maintain relevant technical monitoring records, inspection findings, design review trackers, and follow-up actions.
- Contribute to technical capacity building for PMU counterparts and local personnel, and document lessons learned during implementation and project close-out.