NIB agrees to finance water infrastructure in Tampere, Finland

NIB agrees to finance water infrastructure in Tampere, Finland

Add us as your preferred source on Google to see more of our content in Search.

Google logoAdd to Preferred Sources

NIB has signed an uncommitted loan facility of EUR 150 million with Tampere Region Central Treatment Plant in Finland, to safeguard the treatment of sewage in the Pirkanmaa region far into the future.

The 30-year framework loan agreement gives Tampere Region Central Wastewater Treatment Plant the option to use NIB funding for the construction of a centralised wastewater treatment plant in the Sulkavuori bedrock in Tampere.

The project will reduce the effluent load on Lake Pyhäjärvi and the water system downstream of it. The project will improve the sanitary condition of the Lake Pyhäjärvi and Lempäälä water system downstream of the Hiidenvuolle strait.

The wastewater treatment plant will be an active sludge plant operating on a parallel precipitating principle, where the wastewater is mechanically, chemically and biologically cleaned. The purified effluent will be disinfected by UV treatment.

The construction work at Sulkavuori has commenced, and the wastewater treatment plant is expected to begin operations 2024.

The existing wastewater treatment plants at Viinikkala and Rahola in Tampere as well as in Lempäälä will be closed. All three existing plants are located in the middle of residential area in valuable waterfront areas. Closing the plants will enable the vacated land areas in Tampere and Lempäälä to be redeveloped in a way considered to be a viable and sustainable utilisation of municipal resources.

Original source: NIB
Published on 07 November 2019