General Information
Country: Angola
City/Locality: Luanda
Notice/Contract Number: AO-MINEA - GEPE-210406-CS-QCBS
Publication Date: Aug 29, 2022
Deadline (local time): September 26, 2022 - 15:00
Agency: Agence Française de Développement (AFD)
Buyer: ANGOLA - MINISTRY OF ENERGY AND WATER (MINEA)
Eligibility of Bidders: The Consulting firm must demonstrate a minimum of 10 years’ experience in preparing similar
assignments. Experience in project management and design of SCADA/EMS Systems will be considered
an add-value.
Original Language: English
Original Text
REQUEST FOR EXPRESSIONS OF INTEREST
(Consulting services – Firms selection)
Country: Republic of Angola
Name of Project: Electricity Sector Improvement and Access Project
Project ID No.: P166805
Assignment Title: Owner's Engineer firm to prepare the design, prepare bidding documents to contract the EPC for the construction of the National Control Center (main and backup), Market Operator and supporting offices, installation of SCADA System, Upgrade of local substation automation systems and installation of meters at border points
Reference No.: AO-MINEA - GEPE-210406-CS-QCBS
The Government of the Republic of Angola (GoA) received financing from the International Bank of Reconstruction and Development (IBRD) and co-financing from the French Development Agency (AFD) towards the cost of the Electricity Sector Improvement and Access Project (ESIAP), and intends to apply part of the proceeds for consulting services.
As part of the ESIAP Electricity Service Improvement Component, the Project Coordination Unit (PCU) intends to engage the services of an Owner's Engineer firm to prepare the design, prepare bidding documents to contract the EPC for the construction of the National Control Center (main and backup), Market Operator and supporting offices, installation of SCADA System, Upgrade of local substation automation systems and installation of meters at border points.
The Owner's Engineer will carry-out, among other, the following tasks:
1. Support RNT in the selection of the project site;
2. Preparation of preliminary design concepts for the construction of the buildings for the National
Control Centre (primary and backup);
3. Environmental and Social Assessments;
4. Specifications for the telecommunication network and the Advanced Metering Infrastructure;
5. Preparation of Bidding Documents and assistance during the procurement process.
The contract duration is ten (10) months from the date of commencement of the services - including the reporting deadlines for the separate phases, the validation workshops - and audit period of the assignment. The Consulting firm must demonstrate a minimum of 10 years’ experience in preparing similar assignments. Experience in project management and design of SCADA/EMS Systems will be considered an add-value.
3
Note: ESIAP reserves the right to verify submitted references and use the information obtained for evaluation purposes.
The Project Coordination Unit of the Electricity Sector Improvement and Access Project (ESIAP) now invites eligible consulting firms (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.
The attention of interested Consultants is drawn to Section III, paragraphs 3.14, 3.16, and 3.17 of the World Bank’s “Procurement Regulations for IPF Borrowers, November 2020 (“Procurement Regulations”), setting forth the World Bank’s policy on conflict of interest.
Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.
Consultants are strongly advised to limit their Expression of Interest to 30 pages. Company brochures may be included as attachments and will not be affected by the 30-page limitation. A Consultant will be selected in accordance with the procedures set out in World Bank’s Guidelines: World Bank Procurement Regulations for IPF Borrowers”, dated November 2020 “Quality- and Cost-Based Selection (QCBS) method”.
Further information can be obtained at the address below during office hours (09H00 to 15H00 hours) local time.
Expressions of interest must be preferably delivered by e-mail or delivered by mail, or in person, to the address below, not later than the submission deadline, i.e., on or before September 26, 2022 at 15H00 hours (local time) and mention “Expression of Interest – Owner's Engineer firm to prepare the design, prepare bidding documents to contract the EPC for the construction of the National Control Center (main and backup), Market Operator and supporting offices, installation of SCADA System, Upgrade of local substation automation systems and installation of meters at border points”.
Electricity Sector Improvement and Access Project
Project Coordination Unit
Condomínio Astros
Prédio Aquário, Apto 120-D
Rua do MAT
Talatona
Luanda - Angola
Attn: Mr. João Moreira Pinto Saraiva
Project Coordinator
Tel.: +244 947 913 331
E-mail: esiap.ucp.minea@gmail.com

The World Bank (USA) is part of an international financial agency that makes loans and grants to governments in low- and middle-income countries to fund capital projects. The United States was a driving force behind the founding of the World Bank in 1944 and it is still the World Bank's largest shareholder today.
The United States contributes to tackling critical international development concerns through the World Bank Group and has a long history of generously supporting the objectives of the World Bank Group and has been a champion of the International Development Association (IDA) which provides low-interest loans and grants to the world's poorest countries. The key U.S. priorities at the World Bank include a multilateral health and economic response to COVID-19, debt sustainability and transparency, promoting governance and fighting corruption, ending energy poverty and supporting a strong emphasis on accountability, transparency and development impact.
Involves the production, transformation, transportation, and distribution of energy from renewable and non-renewable sources.
Encompasses initiatives that improve how organizations plan, source, and manage the purchase of goods and services to ensure value for money, compliance, and supplier performance.