Design and Build of Utility Scale Battery Energy Storage Systems (BESS) and Transmission Connection Infrastructure

Last update: Jan 14, 2026

Details

Location: Kosovo
Category: Works
Status: Cancelled
Sectors: Energy
Funding Agency: Millennium Challenge Corporation (USA)
Contracting Authority Type: Consulting organization
Eligibility: Organisation
Budget: N/A
Date posted: Dec 16, 2024

Quick Summary

Objectives: Design and Build of Utility Scale Battery Energy Storage Systems (BES...
Eligibility criteria: Pre-qualification will be conducted through the procedures described in the Pre-Qualification Document (PQD), following the M...
Share

Similar tenders

By Locations
Funding Agency: US DoS
Status: cancelled
Location: Kosovo
Funding Agency: EBRD
Status: cancelled
Location: Kosovo
By Sectors
Funding Agency: MCC
Status: cancelled
Location: Benin
Funding Agency: DBSA
Status: cancelled
Location: South Africa