LOAN-3394 IND: Climate Adaptation in Vennar Subbasin in Cauvery Delta Project - CS-6 Topography Survey - Cauvery
LOAN-3394 IND: Climate Adaptation in Vennar Subbasin in Cauvery Delta Project - CS-6 Topography Survey - Cauvery
Last update: Jun 19, 2018
Last update: Jun 19, 2018
LOAN-3394 IND: Climate Adaptation in Vennar Subbasin in Cauvery Delta Project - CS-6 Topography Survey - Cauvery

Details

Location:
India
India
Category:
Consulting services
Status:
Awarded
Sectors:
Water, Sanitation & Hygiene, GIS, Mapping & Cadastre, Disaster Reduction & Humanitarian Relief
Eligibility:
Organisation
Budget:
USD 378,936
Date posted:
Jun 1, 2017

Attachments • 2

Awar.. .

Jun 19, 2018

TOR_.. .

Jun 1, 2017

Associated Awards • 1

Clim...
Available with membership·See plans

Project cycle timeline

STAGES
EARLY INTELLIGENCE
PROCUREMENT
IMPLEMENTATION
Cancelled
Status
Programming
Formulation
Approval
Forecast
Open
Closed
Shortlisted
Awarded
Evaluation
Want to unlock full information?
Member-only information. Become a member to access this information. Procurement notices from over 850+ sources of tenders and grants published by donors, development banks, foundations, and international financial institutions (IFIs) are available here.

Description

LOAN-3394 IND: Climate Adaptation in Vennar Subbasin in Cauvery Delta Project - CS-6 Topography Survey - Cauvery (44429-013)

Selection Profile

Consultant Type Firm
Selection Method Quality and Cost-Based Selection (QCBS)
Source National
Technical Proposal Biodata Technical Proposal (BTP)
Package Number
    CS-6
Package Name Topography Survey - Cauvery
 
Advance Action
    Read only Checkbox Checked Yes
    Read only Checkbox Not Checked No
Engagement Period
    6
    MONTH
 
Consulting Services Budget
USD
    377,965
Budget Type
    Read only Checkbox Checked Estimated
    Read only Checkbox Not Checked Maximum
Approval Number 3394
Approval Date 07-Jun-2016
Estimated Short-listing Date 10-Jul-2017
Estimated Commencement Date 09-Jan-2018
Open to non-Member Countries
    Read only Checkbox Not Checked Yes
    Read only Checkbox Checked No
Additional Information
 
Possibility of contract extension
    Read only Checkbox Not Checked Yes
    Read only Checkbox Not Checked No
    Read only Checkbox Checked Not known
     
Possibility of consideration for downstream assignment
    Read only Checkbox Not Checked Yes
    Read only Checkbox Not Checked No
    Read only Checkbox Checked Not known
     
Indefinite Delivery Contract (IDC)
    Read only Checkbox Not Checked Yes
    Read only Checkbox Checked No
   
Country of assignment
    India
Country of eligibility for national consultants
    Same as country of assignment
Contact Information
 
Project Officer Superintending Engineer LCB Circle,Thanjavur
    Water Resources Department, Public Works Department, Government of Tamil Nadu
Email [email protected]
   

Terms of Reference

Primary Expertise

Topographical Survey in Cauvery subbasin

TOR Keywords

Topographical Survey - Cauvery

Objective and Purpose of the Assignment

   

A. Background 1. These terms of reference (ToR) outline the scope of works, deliverables and work project for the firm Topography survey - Cauvery. The Topographical survey firm shall conduct survey in the Cauvery sub basin for Water Resources Department, Tamil Nadu for the implementation of the Climate Adaptation in Vennar Sub-basin in Cauvery Delta project (CAVSCDP). 2. Agriculture is the dominant employment sector in Tamil Nadu and it provides livelihoods for nearly 45% of the population. However, the sector’s contribution to state gross domestic product (GDP) fell from 11.1% in 2004-05 to 8.2% in 2010-11. Estimated total water demand in Tamil Nadu in 2001 was 54,395 MCM mainly for irrigation (50,007 MCM), industry/power/livestock (2,192 MCM) and drinking (1,445 MCM) compared to an estimated annual water potential including surface (24,864 MCM) and groundwater (22,423 MCM) is assessed of 46,540 MCM. While the total demand is forecast to go up to 57,725 MCM by 2050, usage for irrigation is not expected to increase significantly because of demand for land for urbanization. 3. There are 17 major river basins in the state, of which the Cauvery basin (81,115 km²) is the largest. About 90% of surface water is used in irrigation. The Cauvery River basin spans the states of Karnataka, Tamil Nadu, Kerala, and part of the Union Territory of Pondicherry. According to the decision of the Cauvery Waters Dispute Tribunal in 2007, 58% (11,865 MCM in average year) of the surface water resources of the basin are allocated to Tamil Nadu. The total potential irrigation demand in the Cauvery delta, excluding irrigation demand upstream of the delta and other water uses, exceeds the available resource. 4. The Cauvery Delta (6900 km²) has a total population of about 4.8 million, with about 73% relying on farming and fishing. There are four main irrigation systems in the delta: (i) Lower Coleroon Anicut (53,000 ha), (ii) Cauvery (200,000 ha), (iii) Vennar (190,000 ha), and (iv) Grand Anicut (121,000 ha). Key constraints faced by the Cauvery Delta farmers are: (i) difficulty in planning of annual cropping pattern due to the lack of assurance about surface water availability; (ii) in efficient distribution and application of water; (iii) in equitable access to water resources with downstream users have intermittent access to surface water and poor access to suitable quality ground water, (iv) crop damage during the north east monsoon due to flooding and poor drainage in coastal areas. The three districts in the Vennar System (Thanjavur, Thiruvarur, Nagapattinam) record the lowest average rice productivity in Tamil Nadu. 5. Climate change is expected to worsen the already challenging situation. The projections indicate much drier conditions between January and May but wetter and warmer conditions during the irrigation season (June to December). However the climate projections also show large increases in storm rainfall and runoff. Therefore more frequent and serious flooding can be expected. Flooding in coastal areas will gradually be exacerbated by rising sea levels. 6. The key management issues facing the water resources sector are: (i) inadequate planning and stakeholder participation in resource management, (ii) limited demand management, (iii) no effective use of economic incentives and penalties to reduce pollution and wastage, (iv) WRD’s mandate and skill set is in irrigation supply will little emphasis on water resources management, (v) under-investment in infrastructure due to the Cauvery waters dispute, (vi) inadequate funding for operation and maintenance, and (vii) flood management is reactive with minimal planning for flood risk mitigation. 7. The Project will contribute to the initial improvement of water resources management in the Cauvery Delta. B. The Project 8. The project comprises two outputs: (i) flood risk management and irrigation infrastructure upgraded, and (ii) improved water and flood risk management systems established. Under Output 1, the project will support the (i) repair and upgrading of existing infrastructure including embankments designed to withstand a 25 year return flood taking into consideration climate change projections, and (ii) construction of new essential infrastructure. Output 2 will deliver non- structural adaptations designed to improve the management of surface water resources, and manage flood risks and flood events. Initiatives to be developed are: (i) improved assessment of water resources through installation of additional rainfall, surface water level, groundwater level and tide level monitoring stations and through direct flow measurements at key structures, (ii) development of a Decision Support System (DSS) and (iii) capacity development of Water Resources Department officers in improved management of water resources. The improvements to management of flood risks and flood events will be achieved through establishment of flood forecasting and warning systems and preparation of flood risk maps. C. Implementation Arrangements 9. The executing agency is the Water Resources Department. A Project Management Unit (PMU) has been established. The PMU is headed by a full time Project Director of Chief Engineer Rank. The PMU is supported by Project Implementation Units (PIUs) established in the respective EEs offices. Five PIUs have been established in Thiruvarur; Nagapattinam; Thiruthuraipoondi; Vennar Basin Division, Thanjavur; and Cauvery Basin Division, Thanjavur. The PMU is supported by two teams of consultants: (i) Project Implementation Consultants supporting Output 1 on implementation and establishment of channel stakeholder groups, (ii) Project Technical Advisory Consultants (PTAC), under Output 2, who will (a) support the implementation of the establishment of a decision support system, and flood risk mapping and establishment of forecasting and warning systems under Output 2 in the project, and (b) support the preparation of feasibility studies for a follow on project covering the remainder of the Vennar Subbasin and Cauvery Subbasin (hereinafter referred to as follow on project). D. Scope of Survey Works 10.Topographical surveys of the canal and drainage network of the coastal part of the Cauvery Main River are required to support the PTAC, modeling and development of a digital elevation Model (DEM). These two outputs need to be completed prior to the main consulting. The Topographical Survey for the subbasins, Pandavaiyar, Harichandranathi, Mulliyar, Koraiyar, Paminiyar, Vedharanyam are completed. This Topographical Survey is for the channels of the main Cauvery River in the delta portion.

 
 
 
 

Experts Needed

International
 
    Read only Checkbox Not Checked Team Leadership from International Experts
 
 
  Expertise or Position Inputs in PM Primary Place of Assignment
No results found.      
National
 
    Read only Checkbox Checked Team Leadership from National Experts
 
 
  Expertise or Position Inputs in PM Primary Place of Assignment
1 Team Leader Personnel 4.5 Other City, India
2 Deputy Team leader 4.8 Other City, India
3 Senior Surveyor 4.8 Other City, India
4 Senior Draughts man 2.5 Other City, India
5 Assistant Surveyor 4.8 Other City, India
6 Assistant Draughts man 2.5 Other City, India
7 Assistant (Helper) 4.8 Other City, India
 

Cost Estimate

Competitive Items Amount in USD  
Remuneration and Other Expenses
All activities and inputs in the TOR but not limited to remuneration, per diem, air travel, miscellaneous travel expenses, report preparation, production, and transmission, land transportation, communications, etc.
247,911  
Sub-total
247,911  
Non-Competitive Items Amount in USD  
Provisional Sums 112,980  
Contingency 18,045  
Sub-total
131,025  
TOTAL 378,936  
 

 

Hidden
tender Background

About the Funding Agency

ADB - Asian Development Bank - based in Manila, Philippines since 1960.

The Asian Development Bank aims for an Asia and Pacific free from poverty. ADB in partnership with member governments, independent specialists and other financial institutions is focused on delivering projects in developing member countries that create economic and development impact.

As a multilateral development finance institution, ADB provides:

  • loans
  • technical assistance
  • grants

 

About the Sectors

Water, Sanitation & Hygiene

Supports initiatives that ensure access to safe water, sanitation systems, and hygiene services to improve public health and living conditions.


Key areas:
  • Water supply and drinking water projects
  • Sanitation systems and wastewater treatment
  • Hygiene promotion and WASH programmes
  • Water infrastructure (wells, boreholes, dams, irrigation)

GIS, Mapping & Cadastre

Encompasses geographic information systems, mapping, and land information activities used for spatial analysis, planning, and land administration.


Key areas:
  • Geographic information systems and spatial data
  • Mapping, cartography, and surveying
  • Cadastre and land information management

Locations

India

India has been expanding transport (roads, railways, ports), energy (renewables and grid modernisation) and digital infrastructure to support rapid urbanisation, industrial growth and integration into global value chains. Through flagship initiatives such as the National Infrastructure Pipeline and PM Gati Shakti Master Plan, the government aims to reduce logistics costs, boost manufacturing competitiveness, and improve connectivity across regions. Public capital expenditure has risen sharply, with increased emphasis on public–private partnerships and climate-aligned investments, while mobilising financing through innovative funds and investor incentives. Key challenges include managing fiscal sustainability, improving project implementation efficiency and reinforcing institutional governance to attract long-term private capital at scale.

Nr. of tenders: 48397
Nr. of grants: 4526
Nr. of donors: 1229
Nr. of jobs: 349
Frequently Asked Questions
Haven't found what you're looking for? Get in touch with us using our contact page.
Where can I find international tenders?
DevelopmentAid aggregates international tenders from major donors, development banks, UN agencies and governments in one searchable platform.
Who can apply for tenders listed on DevelopmentAid?
Tenders are typically open to consulting firms, NGOs, companies, and sometimes individual consultants, depending on the eligibility criteria set by the donor.
How do I apply for a tender?
DevelopmentAid does not submit tenders on your behalf. Each tender listing includes official documents and instructions explaining where and how to apply directly to the contracting authority.
What documents are usually required for a tender application?
Most tenders require a technical proposal, financial offer, company profile, references, and legal documents. Exact requirements are listed in each tender notice.