Share
Print

Country: Liberia
Project Id: P159961
Project Name: Cheesemanburg Landfill and Urban Sanitation Project
Loan/Credit/TF Info.: TF-A5269
Notice Version No.: 1
General Information
|
Notice Type |
Invitation for Prequalification |
|
Borrower Bid Reference |
LR-MCC-86280-CW-RFP |
|
Bid Description |
Design and Construction of the Cheesemnburg Regional Landfill |
|
Language of Notice |
English |
|
Deadline for Application Submission Date |
2020/02/17 |
|
Local Time |
10:00 |
|
Selected category codes for product to be procured |
72121504-Waste disposal plant construction service |
Contact Information on Advertisement
|
Organization/Department |
Monrovia City Corporation |
|
Name |
Tolbert A. Kerkulah |
|
Title |
Project Coorinator |
|
Address |
Monrovia City CorporationMonrovia City UN Drive, Lynch Street Monrovia |
|
City |
|
|
Province/State |
|
|
Postal Code |
|
|
Country |
Liberia |
|
Phone |
00231886-325-677 |
|
Fax |
|
|
|
|
|
Website |
Detailed Information for Advertisement
Specific Procurement Notice – Initial Selection Document (ISD)
Invitation for Initial Selection
Works
(Design and Build)
Employer: Monrovia City Corporation (MCC)
Project: Cheesemanburg Landfill And Urban Sanitation (Clus) Project
Contract title: The Design and Build of the Cheesemanburg Regional Sanitary Landfill for the Greater Monrovia City Corporation and Surrounding Townships
Country: Liberia
Grant No.: TF-0A5269
ISD No: LR-MCC-86280-CW-RFP
Issued on: January 15, 2020
a) Guided by the Project Environmental Social Impact Assessment, Geohydrological, Geotechnical and Topographical Survey baseline information, the design of the CSLF will be expected to mitigate any potential negative impacts while enhancing potential positive impacts.
b) The design of the overall facility will be in line with the broad framework requirements of the client such as i) An outline design of the facility with a design horizon of at least 20 years based on an increasing annual average disposal rate of 100,000 tons; ii) A detailed design of the first operational cell including the necessary infrastructure based on final design drawings, construction details, final quantities, cost estimates, technical specifications, operating manuals, and health and safety plans; iii) Detailed design and construction requirements based on acceptable specifications would inter alia cover the landfill cell and barrier systems, leachate drainage and management, surface water management, administration and ablution facilities, operational controls, access road and control as well as haul roads, weighbridge and record keeping, management of recyclables and special wastes, materials balance and covering of waste, stability of slopes and surfaces, landfill operations and management, workshop and washing facilities, landfill gas management, all within the landfill facility;
c) Construct and supervise the works, taking care of all contract management aspects in order to render and handover an acceptable facility in line with the approved designs to the MCC during the commissioning and start-up of the activities. Construction Quality Control (CQA) will be an essential part of the construction process in line with the environmental management plan (EMP), health and safety plans and contractor’s design specifications to be executed by the contractor.
3.1 Applicant must not have been sanctioned by the Bank, pursuant to the Bank’s Anti-Corruption Guidelines, and in accordance with its prevailing sanctions policies and procedures as set forth in the WBG’s Sanctions Framework, as described in Section VI, paragraph 2.2 d as further described in ITA 4.7 and 5.1 of the prequalification documentation.
3.2 Not under suspension based on execution of Bid or Proposal Securing Declaration pursuant to ITA 4.10 ;
3.3 Must not have been suspended on the basis of non-compliance of any environmental, or social (including Sexual Exploitation and Assault or gender based violence) contractual obligations in the past five years
3.4 The Applicant shall demonstrate that it has access to, or has available, liquid assets, unencumbered real assets, lines of credit, and other financial means (independent of any contractual advance payment) sufficient to meet the cash flow requirements estimated as USD $ 2 000 000;.
3.5.Must have audited balance sheets or, if not required by the laws of the Applicant’s country, other financial statements acceptable to the Employer, for the last 3 years shall be submitted and must demonstrate the current soundness of the Applicant’s financial position and indicate its prospective long-term profitability.
3.6.Must have minimum average annual construction turnover of US$ Two Million (2 000 000), calculated as total certified payments received for contracts in progress and/or completed within the last 3 years ( 2016, 2017,2018 )
3.7.Must have experience under construction contracts in the role of prime contractor, JV member, subcontractor, or management contractor for at least the last 3 years, starting 1st January 2016.
3.8.Must have a minimum number of 3 similar contract that have been satisfactorily and substantially completed as a prime contractor, joint venture member, management contractor or subcontractor between 1st January 2016 and Application submission deadline ; 3 contracts, each of minimum value US$1,5 000 000;
3.9.Must have a minimum design and build experience in at least 3 contracts one of which should have been in a developing or low income country;
Tolbert A. Kerkulah
The Project Coordinator
Project Implementation Unit (PIU)
Cheesemanburg Landfill & Urban Sanitation (CLUS) Project
UN Drive- MCC Compound- Central Monrovia
Monrovia City Hall
P. O. BOX 9029
Tubman Boulevard
Monrovia City Corporation
Monrovia, Liberia
E-mail Addresses: clusproject2017@gmail.com also copied to: eddjohnson72@gmail.com

The World Bank (USA) is part of an international financial agency that makes loans and grants to governments in low- and middle-income countries to fund capital projects. The United States was a driving force behind the founding of the World Bank in 1944 and it is still the World Bank's largest shareholder today.
The United States contributes to tackling critical international development concerns through the World Bank Group and has a long history of generously supporting the objectives of the World Bank Group and has been a champion of the International Development Association (IDA) which provides low-interest loans and grants to the world's poorest countries. The key U.S. priorities at the World Bank include a multilateral health and economic response to COVID-19, debt sustainability and transparency, promoting governance and fighting corruption, ending energy poverty and supporting a strong emphasis on accountability, transparency and development impact.
Includes initiatives aimed at reducing environmental pollution and improving the collection, treatment, and disposal of waste.
Encompasses the planning, design, construction, and maintenance of the physical and naturally built environment and public works within the built environment.