Project ID: P157079
Project Title: Heat Supply Improvement Project
Borrower Bid Reference: IDA-HSIP-ICB-IHS/1-2020
Invitation for Bids
The Kyrgyz Republic
Heat Supply Improvement Project
Credit No. 6146-KG / Grant No. D240-KG
Contract Title: Supply of new building-level individual heat substations (IHS) and Supply of spare parts and components for IHS overhaul.
Reference No. (as per Procurement Plan): IDA-HSIP-ICB-IHS/1-2020
1. The Kyrgyz Republic has received financing from the World Bank toward the cost of the Heat Supply Improvement Project, and intends to apply part of the proceeds toward payments under the contract for Supply of new building-level individual heat substations (IHS) and Supply of spare parts and components for IHS overhaul.
2. The OJSC Bishkekteploset as implementing agency for the district heating component of the Heat Supply Improvement Project now invites sealed bids from eligible bidders for delivery of the following goods:
|
Line Item N° |
Description of Goods |
Physical unit |
Quantity |
|
|
|
|
|
|
1 |
Building-level individual heat substations (HIS), the set is specified in the technical specifications including spare parts:
|
set |
221 |
|
2 |
Recirculation pumps, d/h 3280. One phase |
Pcs. |
230 |
|
3 |
Recirculation pumps, Dimension d/h 40120. One phase |
Pcs. |
350 |
|
4 |
Recirculation pumps, Dimension d/h 50120. One phase |
Pcs. |
120 |
|
5 |
Recirculation pumps, Dimension d/h 65120. Three phase |
Pcs. |
30 |
|
6 |
Recirculation pumps, Dimension d/h 80120. Three phase. |
Pcs. |
5 |
|
7 |
Mating flanges for pumps, Dimension d/h 40120 |
Set |
65 |
|
8 |
Mating flanges for pumps, Dimension d/h 50120 |
Set |
15 |
|
9 |
Two-way flanged control valves with electric drive, DN 20 mm |
Pcs. |
83 |
|
10 |
Two-way flanged control valves with electric drive, DN 25 mm |
Pcs. |
880 |
|
11 |
Two-way flanged control valves with electric drive, DN 32 mm |
Pcs. |
655 |
|
12 |
Two-way flanged control valves with electric drive, DN 40 mm |
Pcs. |
158 |
|
13 |
Two-way flanged control valves with electric drive, DN 50 mm |
Pcs. |
42 |
|
14 |
Two-way flanged control valves with electric drive, DN 65 mm |
Pcs. |
5 |
|
15 |
Two-way flanged control valves with electric drive, DN 80 mm |
Pcs. |
2 |
|
16 |
Mating flanges for valves, DN 25 mm
|
Set |
220 |
|
17 |
Mating flanges for valves, DN 32 mm |
Set |
10 |
|
18 |
Non-return valves mounted between flanges, DN 32 mm |
Pcs. |
13 |
|
19 |
Non-return valves mounted between flanges, DN 40 mm |
Pcs. |
82 |
|
20 |
Non-return valves mounted between flanges, DN 50 mm |
Pcs. |
600 |
|
21 |
Non-return valves mounted between flanges, DN 65 mm |
Pcs. |
700 |
|
22 |
Non-return valves mounted between flanges, DN 80 mm |
Pcs. |
150 |
|
23 |
Non-return valves mounted between flanges, DN 100 mm |
Pcs. |
37 |
|
24 |
Non-return valves mounted between flanges, DN 125 mm |
Pcs. |
4 |
|
25 |
Controller with therminal board |
Pcs. |
1825 |
|
26 |
Programing key for Controller1 |
Pcs. |
50 |
|
27 |
Ambient temperature sensor |
Pcs. |
1825 |
|
28 |
Immersion temperature sensor |
Pcs. |
8900 |
|
29 |
Liquid thermometer |
Pcs. |
3000 |
|
30 |
Manometers |
Pcs. |
6000 |
|
31 |
Thermostatic valve, DN 20 mm |
Pcs. |
1825 |
|
32 |
Pressure sensor |
Pcs. |
3650 |
|
33 |
Coupling ball valve, DN 15 mm |
Pcs. |
16 |
|
34 |
Coupling ball valve, DN 20 mm |
Pcs. |
194 |
|
35 |
Coupling ball valve, DN 25 mm |
Pcs. |
839 |
|
36 |
Coupling ball valve, DN 32 mm |
Pcs. |
432 |
|
37 |
Coupling ball valve, DN 40 mm |
Pcs. |
91 |
|
38 |
Coupling ball valve, DN 50 mm |
Pcs. |
29 |
|
39 |
Coupling check valve, DN 15 mm |
Pcs. |
16 |
|
40 |
Coupling check valve, DN 20 mm |
Pcs. |
194 |
|
41 |
Coupling check valve, DN 25 mm |
Pcs. |
839 |
|
42 |
Coupling check valve, DN 32 mm |
Pcs. |
432 |
|
43 |
Coupling check valve, DN 40 mm |
Pcs. |
91 |
|
44 |
Coupling check valve, DN 50 mm |
Pcs. |
29 |
|
45 |
Three way control valves with actuator, DN 15 mm |
Pcs. |
16 |
|
46 |
Three way control valves with actuator, DN 20 mm |
Pcs. |
194 |
|
47 |
Three way control valves with actuator, DN 25 mm |
Pcs. |
839 |
|
48 |
Three way control valves with actuator, DN 32 mm |
Pcs. |
432 |
|
49 |
Three way control valves with actuator, DN 40 mm |
Pcs. |
91 |
|
50 |
Three way control valves with actuator, DN 50mm |
Pcs. |
29 |
|
51 |
Cable for connection of controllers, pumps, control valves, thermal sensors, pressure sensors and etc. |
m |
80000 |
|
Related Services |
|||
|
52 |
Training on installing new IHS and spare parts and accessories for overhaul of IHS |
person |
21 |
|
53 |
Training on maintenance of new IHS |
person |
59 |
|
|
|
|
|
Domestic preference is not applicable.
3. Bidding will be conducted through the International Competitive Bidding procedures as specified in the World Bank’s Guidelines: Procurement of Goods, Works and Non-Consulting Services under IBRD Loans and IDA Credits & Grants by World Bank Borrowers dated 2014 (“Procurement Guidelines”), and is open to all eligible bidders as defined in the Procurement Guidelines. In addition, please refer to paragraphs 1.6 and 1.7 setting forth the World Bank’s policy on conflict of interest.
4. Interested eligible bidders may obtain further information from Heat Supply Improvement Project Implementation Unit (PIU), OJSC “Bishkekteploset”, e-mail address piu@teploseti.kg and inspect the bidding documents throughout the period December 11, 2020 – January 21, 2021, during office hours 07:30 to 16:30 at the address given below.
5. A complete set of bidding documents in English and Russian languages may be received by interested bidders on the submission of a written application. The Bidding Documents will be forwarded by electronic mail in PDF file or the e-version may be collected by a bidder’s representative from the PIU office at the address below.
6. The bidders shall bid for all 53 items including training as all 53 items are needed to complete implementation of this heating project. A failure to bid for All 53 items shall result in rejection of the bid. The bidder should read carefully the requirements of the bidding documents in order to submit responsive bid and avoid wasting time and resources. If you need clarifications, please contact to the address below prior to the deadline for clarifications as stated in the Bidding Documents.
7. Bids in English or Russian version must be delivered to the address below on or before 10:00 January 22, 2021. Electronic bidding will not be permitted. Late bids will be rejected. Bids will be publicly opened in the presence of the bidders’ designated representatives and anyone who choose to attend at the address below on January 22, 2021, 10:00 Bishkek time.
8. All bids must be accompanied by a “Bid Security” of 150 000.00 US Dollars.
9. The address referred to above is:
Attention: Mr. Nurlan Kurumshiev
Street Address: 2/1 Zhukeeva-Pudovkina str.
Floor/ Room number: 4 floor
City: Bishkek
ZIP Code: 720031
Country: The Kyrgyz Republic
Telephone: +(996) 312 56 11 01, +(996) 312 56 88 22
Facsimile number: +(996) 312 59 14 56
Electronic mail address: piu@teploseti.kg
CONTACT INFORMATION
Organization/Department: Bishkekteploset OJSC
NameNurbek Sharshekeev
Address2/1, Jukeeva-Pudovkina St., Bishkek
City
Province/StateKyrgyz Republic
Postal Code
CountryKyrgyz Republic
Phone+996312561101
Emailnurbek.sharshekeyev@gmail.com
Websitewww.teploseti.kg

The World Bank (USA) is part of an international financial agency that makes loans and grants to governments in low- and middle-income countries to fund capital projects. The United States was a driving force behind the founding of the World Bank in 1944 and it is still the World Bank's largest shareholder today.
The United States contributes to tackling critical international development concerns through the World Bank Group and has a long history of generously supporting the objectives of the World Bank Group and has been a champion of the International Development Association (IDA) which provides low-interest loans and grants to the world's poorest countries. The key U.S. priorities at the World Bank include a multilateral health and economic response to COVID-19, debt sustainability and transparency, promoting governance and fighting corruption, ending energy poverty and supporting a strong emphasis on accountability, transparency and development impact.
Covers formal and informal education, training, and capacity-building activities that develop knowledge, skills, and institutional capabilities across all age groups.
Involves systems and equipment used for heating, cooling, ventilation, and temperature control in buildings and facilities.