Share
Print

RS-Belgrade: Railway reconstruction and modernization - Telecommunication installations and cables works; Electric traction fixed installations and electric power installations; Signalling and interlocking facilities (EIB)
2011/S 232-375249
Joint Stock Company "SERBIAN RAIWAYS"
RAILWAYS REHABILITATION PROJECT II
ANNOUNCES
INVITATION
for submission of offers for supply of equipment and execution of the works on reconstruction and modernization of the electro-technical facilities (Lot 1 - signaling - interlocking facilities, Lot 2 - telecommunication facilities and Lot 3 - overhead contact line and power supply facilities) on the Gilje-Cuprija-Paracin section of the Belgrade - Nis railway line
Joint Stock Company "Serbian Railways" hereinafter referred to as "the Employer" intends to use a part of the proceeds of the loan from the European Investment Bank (Bank) towards the cost of execution of the works related to the reconstruction and modernization of the Gilje - Cuprija - Paracin section of the Belgrade-Nis railway line.
The Employer invites the tenderers to submit the sealed offers for the following contract to be funded from a part of the proceeds of the loan:
"Supply of equipment and execution of the works on reconstruction and modernization of the electro-technical facilities (Lot 1 - Signaling - interlocking facilities, Lot 2 - Telecommunication facilities and Lot 3 - Overhead contact line and power supply facilities) on the Gilje - Ćuprija - Paraćin section of the Belgrade - Niš railway line".
Within the first stage of reconstruction and modernization of the existing Gilje - Ćuprija - Paraćin single-track line, the works related to the construction of a double-track railway bridge over the Velika Morava River are ongoing on this section.
On the concerned section, the civil engineering works of reconstruction and modernization of the railway line, will be performed simultaneously.
The above works are planned to be performed along with the works which are subject of this Invitation, and to be completed together.
Tendering for the present contract is open to all firms from all countries. The proceeds of the Bank's loan will not be used for any payments to persons or entities or for any import of goods if such payment or import is prohibited by the decision of the United Nations Security Council pursuant to Chapter VII of the Charter of the United Nations.
In order to qualify for the award of the contract, tenderers must satisfy the following minimum requirements:
— The Tenderer must show documentary evidence of its full compliance with the requirements with respect to the experience and expertise of its staff, its having necessary equipment at its disposal, its financial viability and court disputes;
— The Tenderer and/or its prospective subcontractors must have appropriate licenses for the execution of the works, issued by a competent authority in the country where the Tenderer has its registered office; if the Tenderer is not from the Employer's country, the license submitted by a foreign Tenderer and subcontractors must be translated into English and certified;
— The Tenderer must have minimum 5 years of experience in the execution of the works on railway lines;
— The Tenderer's average annual turnover over the last 3 years (2008, 2009, 2010) (applicable for single tenderer as well as for Joint Ventures) must be in the amount of 20 million EURO or equivalent;
— The Tenderer must have successful experience in the execution of at least:
—— 2 projects for construction/reconstruction of overhead contact line systems i.e. stable electric-traction installations on the railway lines with the high voltage alternate current overhead contact lines, in the amount of EUR 5 million each, and
—— 2 projects for construction/reconstruction of the signaling and safety and/or telecommunication devices on railway lines in the amount of EUR 5 million each,
out of each group of the above mentioned projects, at least one project should be completed individually or as a leading partner in JV/Consortium.
— The Tenderer must demonstrate, by a bank statement from his bank, that he may have available or he may have access, if necessary, to the liquid assets, credit lines or other financial means sufficient to meet the construction cash flow according to the contract for a period of 6 months, not less than the amount equivalent to EUR 4 million (applicable to single tenderer as well as for Joint Ventures);
— The Tenderer must submit the audited financial statements (Balance Sheet + Profit and Loss Account) for the last 3 years and demonstrate the soundness of the applicant's financial position and its long-term profitability;
— The Joint Venture/Consortium must satisfy cumulatively all of the above stated criteria related to the general experience and financial resources, and the leading partner must meet individually the criteria of average annual turnover over the last three years in the amount equivalent to EUR 8 million EURO;
— All partners in the JV/Consortium and specialized sub-contractors shall satisfy the sound financial position and litigation history criteria.
Tender documentation may be obtained from the office at the address below upon payment of non-refundable fee of EUR 500, or equivalent in RSD or another convertible currency.
Before purchasing the Tender documents, all interested parties can obtain the Tender documents for viewing in the premises of JSC "Serbian Railways" at the address below.
Payments in EUR or another convertible currency can be made by a bank transfer with Unicredit Bank a.d. Beograd according to the following instructions:
— reference number 11 44016-302-54022011
SWIFT MT103
FIELD NAME; CONTENT
Send; Ordering part bank
Receive; BACXRSBG
Transaction reference number:20: Tender EIB 08/2011
Value date/currency code/amount:32A:
Ordering customer:50:
Sender's correspondent:53A:
Intermediary reimbursement institution:54A: BKAUATWW
Account with institution:57A: BACXRSBG
Beneficiary customer:59:
/ RS35170003900402100806
(Account number)
AKCIONARSKO DRUŠTVO
ŽELEZNICE SRBIJE
NEMANJINA br.6
11000 BEOGRAD
SERBIA
(Name and Address)
Details of payment:70:
NOTE:
Please instruct your bank to send MT103 directly to UNICREDIT BANK SERBIA JSC, Belgrade, Serbia (SWIFT BIC: BACXRSBG) covering EUR account of UNICREDIT BANK SERBIA JSC with BANK AUSTRIA CREDITANSTALT AG, Vienna (SWIFT BIC: BKAUATWW)
In order to avoid any further correspondence, delay or return of payment due to incomplete information MT 103 must always include:
1. full name and address (street, city, state) of the ordering customer - field 50;
2. full name and IBAN (account number) of the beneficiary customer - field 59.
Payments in RSD, at the middle exchange rate of the National Bank of Serbia on the date of payment, can be made by means of a bank transfer to the following account:
Beneficiary: AD "Železnice Srbije"
Account No: 170-729-58
Reference. No: 11 44016-248-50022011
If requested, and with pre-paid courier costs by the Tenderer, the documentation can be promptly dispatched by courier, but without any Employer's liability for eventual loss or late delivery.
All offers must be accompanied by a tender security in the amount of minimum EUR 300,000.00 or the equivalent amount in RSD or another convertible currency.
The offers shall remain valid for the period of 120 days after expiry of the deadline for submission of offers. The offers with the validity period shorter than the above stated shall be rejected by the Employer as non-compliant.
Offers must be delivered to the office at the address below not later than February 10, 2012, at 12:00 o'clock (noon) local time, and will be opened the same day at 3 p.m. local time, in JSC "Serbian Railways" Headquarters, in Great Hall on the 1st floor, in the presence of those tenderers' representatives who choose to attend.
The tenderers who have purchased the tender documentation may inspect the register of prospective tenderers.
The tenderers who have purchased the tender documentation may obtain it at the below address:
AD "Železnice Srbije" (JSC "Serbian Railways"), Investments Department, Marko Petrović / Svetlana Joksimović, room 603, floor IV, 6 Nemanjina St., Belgrade, Republic of Serbia; tel.: +381 113613567 / 113616782; fax.: +381 113610508; e-mail: [email protected] with "Cc" to [email protected].
Belgrade, November 21, 2011
RS-Belgrade: Railway reconstruction and modernization - Telecommunication installations and cables works; Electric traction fixed installations and electric power installations; Signalling and interlocking facilities (EIB)
2012/S 118-194275
(Supplement to the Official Journal of the European Union, 2.12.2011, 2011/S 232-375249)
AD "Železnice Srbije" (JSC "Serbian Railways"), Belgrade.

The European Investment Bank (EIB) is the lending arm of the European Union. The EIB is the biggest multilateral financial institution in the world and one of the largest providers of climate finance.
The EIB works closely with other EU institutions to foster European integration, promote the development of the EU and support EU policies in over 160 countries around the world.
Through EIB Global, set up in 2022 to increase the impact of our development finance, the EIB helps address global challenges and creates growth and opportunity on all continents.
Involves the production, transformation, transportation, and distribution of energy from renewable and non-renewable sources.
Encompasses the planning, design, construction, and maintenance of the physical and naturally built environment and public works within the built environment.