Share
Print
Call Updates
Sep 23, 2022 7:56:21 AM
The call for proposals HORIZON-CL5-2022-D2-01 closed on 6/09/2022. 100 proposals were submitted to the call.
The breakdown per topic is:
Apr 28, 2022 12:00:01 AM
The submission session is now available for: HORIZON-CL5-2022-D2-01-04(HORIZON-IA)
Towards creating an integrated manufacturing value chain in Europe: from machinery development to plant and site integrated design (Batteries Partnership)
TOPIC ID: HORIZON-CL5-2022-D2-01-04
Programme: Horizon Europe Framework Programme (HORIZON)
Call: Cross-sectoral solutions for the climate transition (HORIZON-CL5-2022-D2-01)
Type of action: HORIZON-IA HORIZON Innovation Actions
Type of MGA: HORIZON Action Grant Budget-Based [HORIZON-AG]
Deadline model: single-stage
Planned opening date: 28 April 2022
Deadline date: 06 September 2022 17:00:00 Brussels time
Topic description
ExpectedOutcome:
Project results are expected to contribute to all of the following expected outcomes:
Scope:
In order to build globally competitive Li ion battery (LIB) cell production plants in Europe, all the production value chain from machinery to plant and site development and optimisation is expected to be considered holistically, from machinery development to plant and site integration and optimisation. This topic intents to cover both areas.
In recent years Europe has developed strong competences in Li ion battery technology with regard to academic research, material development and Battery system design. However, there is still a lack of knowledge and competence regarding the economically and ecologically production of LIB cells in both high volumes in Giga-factories or in much smaller batches for specialised applications as developed in Mega-factories. From this perspective, the scope of this topic is two-fold:
In the development of such battery manufacturing machinery, important aspects for success include: minimising energy consumption, eliminating air and water pollution and integration of intelligent control processes to minimise scrap thus reducing costs and environmental impact of the production process. In addition, such machinery is expected to operate at very high productivity levels with incorporate intelligent quality control systems. Moreover, strategies of industry 4.0 should be intensively integrated in new European cell production plants to yield economic success.
Activities under this topics would cover from TRL 3 (start) to TRL 6 (target).
Activities under this topic would cover from TRL 6 (today) to TRL 7 (target).
Hence, this topic aims at closing a gap and enabling deeper collaboration between industrial-scale cell manufacturing, battery process equipment companies, and material and other industrial sectors potentially benefitting from sector coupling with cell manufacturing (e.g. grid power or material suppliers).
Therefore, existing cell production lines and their material and energy flow internally and externally interaction with other companies at the site should be investigated and evaluated. Based on this, the network should investigate the ecological impact of different machinery, production line configurations and factory designs to come to best practice proposals. Another challenge is to implement ecological standards along the production chain together with material suppliers and factory operators.
One additional target to achieve these goals is to stimulate and intensify the collaboration between pilot line operators (e.g. which should be organised within the LiPLANET network), industrial-scale academia, cell manufacturing companies and European equipment companies to push innovations with regard to an economically and ecologically sustainable cell production in Europe. This includes the support from running activities including for example IPCEI's on batteries.