Horizon Europe (2021 - 2027)

Demonstration of innovative forms of storage and their successful operation and integration into innovative energy systems and grid architectures

Last update: Feb 2, 2023 Last update: Feb 2, 2023

Details

Location:EU 27
EU 27
Contracting authority type:Development Institution
Status:Awarded
Budget: EUR 15,000,000
Award ceiling:N/A
Award floor:N/A
Sector:Energy
Eligible applicants:Unrestricted / Unspecified, Individuals
Eligible citizenships:Afghanistan, Albania, Algeria, A ...
See more
Afghanistan, Albania, Algeria, American Samoa, Angola, Anguilla, Argentina, Armenia, Aruba, Austria, Azerbaijan, Azores, Bangladesh, Belarus, Belgium, Belize, Benin, Bermuda, Bhutan, Bolivia, Bosnia and Herzegovina, Botswana, British Virgin Islands, Bulgaria, Burkina Faso, Burundi, Cambodia, Cameroon, Canary Islands, Cape Verde, Caribbean Netherlands, Cayman Islands, Central African Republic, Chad, Chile, Colombia, Comoros, Congo, Costa Rica, Cote d'Ivoire, Croatia, Cuba, Cyprus, Czech Republic, Dem. Rep. Congo, Denmark, Djibouti, Dominica, Commonwealth of, Dominican Republic, Ecuador, Egypt, El Salvador, Eritrea, Estonia, Eswatini (Swaziland), Ethiopia, Falkland Islands, Faroe Islands, Fiji, Finland, France, French Polynesia, French Southern Territory, Gabon, Gambia, Georgia, Germany, Ghana, Greece, Greenland, Grenada, Guatemala, Guinea, Guinea-Bissau, Guyana, Haiti, Honduras, Hungary, Iceland, Indonesia, Iran, Iraq, Ireland, Israel, Italy, Jamaica, Jordan, Kazakhstan, Kenya, Kiribati, Kosovo, Kyrgyzstan, Laos, Latvia, Lebanon, Lesotho, Liberia, Libya, Lithuania, Luxembourg, Madagascar, Malawi, Malaysia, Maldives, Mali, Malta, Marshall Islands, Mauritania, Mauritius, Micronesia, Moldova, Mongolia, Montenegro, Montserrat, Morocco, Mozambique, Myanmar, Namibia, Nepal, Netherlands, New Caledonia, Nicaragua, Niger, Nigeria, North Korea, North Macedonia, Norway, Pakistan, Palau, Palestine / West Bank & Gaza, Panama, Papua New Guinea, Paraguay, Peru, Philippines, Pitcairn, Poland, Portugal, Romania, Rwanda, Saint Helena, Saint Kitts and Nevis, Saint Lucia, Saint Vincent and the Grenadines, Samoa, Sao Tome and Principe, Senegal, Serbia, Seychelles, Sierra Leone, Slovakia, Slovenia, Solomon Islands, Somalia, South Africa, South Sudan, Spain, Sri Lanka, St. Pierre and Miquelon, Sudan, Suriname, Sweden, Switzerland, Syria, Tajikistan, Tanzania, Thailand, Timor-Leste, Togo, Tonga, Tunisia, Turkey, Turkmenistan, Turks and Caicos, Tuvalu, Uganda, Ukraine, Uruguay, Uzbekistan, Vanuatu, Venezuela, Vietnam, Wallis and Futuna, Yemen, Zambia, Zimbabwe
Date posted: Jun 21, 2021

Attachments 4

Description

Call Updates

Aug 2, 2022 10:57:00 AM

Call: HORIZON-CL5-2022-D3-01

Deadline: 26-04-2022

The results of the evaluation are as follows:

HORIZON-CL5-2022-D3-01-11

  •  17 Submitted
  •  15 Evaluated
  •  6 Above threshold
  •  46.6 €Mln Requested contribution

The last column shows the total EU contribution requested by above threshold proposals, to be compared with the topic budgets.

We recently informed the applicants about the evaluation results for their proposals.

For questions, please contact the Research Enquiry Service.

https://ec.europa.eu/info/funding-tenders/opportunities/portal/screen/support/helpdesks


Apr 29, 2022 4:18:09 PM

The call for proposals HORIZON-CL5-2022-D3-01 closed on 26/04/2022.

196 proposals were submitted to the call.

The breakdown per topic is:

  • HORIZON-CL5-2022-D3-01-11 (IA): 16 proposals

Oct 28, 2021 6:00:04 PM

The submission session is now available for: HORIZON-CL5-2022-D3-01-11(HORIZON-IA)


Demonstration of innovative forms of storage and their successful operation and integration into innovative energy systems and grid architectures

TOPIC ID: HORIZON-CL5-2022-D3-01-11

Programme: Horizon Europe Framework Programme (HORIZON)
Call: Sustainable, secure and competitive energy supply (HORIZON-CL5-2022-D3-01)
Type of action: HORIZON-IA HORIZON Innovation Actions
Type of MGA: HORIZON Action Grant Budget-Based [HORIZON-AG]
Deadline model: single-stage
Planned opening date: 14 October 2021
Deadline date: 26 April 2022 17:00:00 Brussels time

Topic description

ExpectedOutcome:

Project results are expected to contribute to most of the following expected outcomes:

  • Demonstration of innovative storage technologies which go beyond the state-of-the art of existing storage solutions in respect of sustainability, technical performance, lifetime, non-dependency on location geographical particularities and cost.
  • Increased availability, robustness and safety of sustainable and efficient choices for energy storage to reduce energy losses and improve the environmental footprint of the energy system.
  • Demonstrated availability and functionality of innovative energy storage systems developed for specific system designs and applications.
  • Improvement of the already established European storage value chain able to contribute to the EU climate neutrality objectives.
  • Creation and improvement of European technological value chains with the potential for international cooperation and market exploration
  • Demonstration of successful business cases and systems designs for energy storage integration solutions in innovative and 'green' energy systems at different scales and timeframes.
  • Demonstration of effective integration of innovative energy storage systems and value chains at the interface of renewable energies and specific demand sectors
  • Ensuring the compatibility of systems and standards of distributed energy storage for participation in flexibility markets.

Scope:

Demonstration of successful operation and integration of either standalone or combined innovative storage solutions (e.g. chemical, electrical, thermal, mechanical including e.g. compressed air/liquid, supercapacitors, innovative hydropower storage solutions) into innovative energy systems and grid architectures. Material development with respect to Supercapacitors is excluded from this topic, as it is treated in Cluster 4, topic HORIZON-CL4-2022-RESILIENCE-01-24 ("Novel materials for supercapacitor energy storage").

Solutions should in particular explore, how innovative storage solutions can enable and drive further the successful penetration of renewable into the European energy mix across several important demand sectors (industry, energy, transport, residential, agriculture) by delivering effectively at the interface of renewable energies and specific demand sector needs.

The solutions should show clear innovation with respect to the state of the art e.g. through use of new advanced materials or new design solutions, always bearing in mind the objective of sustainability and circular economy, minimizing the environmental footprint.

The demonstrated technologies should respond to energy storage flexibility requirements in form of technological requirements and expected future investment and operational costs and business cases in existing or emerging energy markets, by acknowledging existing system designs and energy grid architectures. The demonstrated technologies should include interfaces for connecting with existing infrastructure, e.g. of hydraulic systems for innovative hydropower or the use of natural gas storage sites for hydrogen or biomethane storage, or abandoned infrastructure such as mines, or storage solutions in district heating networks.

When integrating the storage solution, common architecture models (Smart Grids Architecture Model - SGAM[1]) and implementing standards (such as CEN-CENELEC, SAREF etc.) should be taken into account to ensure interoperability and compatibility.

Highest interoperability should be reached ideally for all, but in any case for most of the use cases of storage, so that cost of deployment of distributed storage is decreased.

Technical and regulatory barriers, also including the market dimension, should be taken into account. This together with considering consumer acceptance of the solution as a prerequisite to increasing participation of consumers in the energy system.

The selected projects are expected to contribute to relevant BRIDGE[2] activities.

Specific Topic Conditions:
Activities are expected to achieve TRL 6-7 by the end of the project – see General Annex B.

[1]https://ec.europa.eu/energy/sites/ener/files/documents/xpert_group1_reference_architecture.pdf

[2]https://www.h2020-bridge.eu/

Want to unlock full information?
Member-only information. Become a member to access this information. Procurement notices from over 120+ donors and banks are available here