SARI Consulting Ltd

Environmental, Health and Safety Officer - Water Supply Systems and Distribution

To apply for this job to your existing account or an account for free.
Last update: May 11, 2023 Last update: May 11, 2023

Details

Deadline: May 31, 2023 Deadline for applications has passed
Location: Angola
Organization: SARI Consulting Ltd
Job type:Contract, 12 months +
Languages:
EnglishEnglish
Work experience: Min 3 years
Date posted:May 10, 2023
Expected starting date:Jan 1, 2024

Attachments

No documents to display

Description

 Environmental, Health and Safety Officer 18 man/months  (full time during design and construction phase).

The candidate for this position must be a qualified technician and should demonstrate sound experience with Environmental, Social, Health and Safety (ESHS) issues. Specifically, S/he should have the following qualifications:

University degree (BSc) in Environmental /Civil/Sanitary engineering, MSc degree in Environmental/Civil/Sanitary engineering will be an added advantage;

At least three years post qualification working experience in environmental management of construction works, with emphasis on occupational health and safety; development of ESMP and HSP including its on-site implementation; experience in a similar position in an internationally financed project will be a plus.

Should have strong computer skills.

Work experience in the Sub-Saharan African countries; working experience in Angola will be a plus.

Should possess good working communication skills in English; knowledge of Portuguese will be a plus.

Consultancy Services for Design Checking and works Supervision of the Water Supply remedial works interventions in the cities of Cuito, Huambo and Lubango – Angola.

The scope of works will include all the required interventions in bulk water supply systems and distribution water supply systems, in the 3 referred cities.

The detailed design of the required interventions for the good functioning of the existing bulk water supply systems and distribution water supply systems, will comprise:

  • Rehabilitation of both Cuquema bulk water supply systems, and Cussola bulk water supply system, as well the needed interventions in the distribution network and reservoirs, and the rehabilitation of existing 5000 household connections currently out of service, in Cuito;
  • Rehabilitation of Kulimahala bulk water supply systems, as well needed interventions in the distribution network and reservoirs, in Huambo;
  • Rehabilitation of Senhora do Monte bulk water supply systems, as well interventions in the distribution network and reservoirs, in Lubango;

The detailed design of the above interventions shall be followed by the construction of the related works.

The overall objective of this consultancy assignment is to carry out the design review of the rehabilitation works on the existing water supply systems, in the cities of Cuito, Huambo and Lubango, and existing water supply systems rehabilitation works, and the site supervision as the “The Engineer” (also referred to as Project Manager or Engineer’s Representative) in accordance with the Contract Conditions and the Environmental and Social Management Framework for the Water Sector Institutional Development Project and Resettlement Policy Framework – ESMF/RPF safeguard documents and local environmental and social legislation, including site specific environmental and social safeguards instruments.