African Development Bank approves USD 503.75 million for South Africa’s infrastructure reforms

African Development Bank approves USD 503.75 million for South Africa’s infrastructure reforms

Add us as your preferred source on Google to see more of our content in Search.

Google logoAdd to Preferred Sources

The African Development Bank Group’s (AfDB) Board of Directors has approved a USD 503.75 million loan to South Africa to support reforms opening its electricity, freight transport and water sectors to competition and private investment, according to a press release. The Infrastructure Governance Reform Program is the third reform operation since 2023 and backs a wholesale electricity market, private rail and port operators, and licensing for municipal water suppliers. It is being implemented within a coordinated development-partner framework, led by the National Treasury. The operation reinforces structural reforms across energy, transport and water. It also aims to deliver measurable service-delivery outcomes to citizens.

The new loan builds on budget support to South Africa that has been ongoing since 2023 and now totals over USD 1.2 billion. Of that, USD 300 million went to the 2023 Energy Governance and Climate Resilience Support Program (ECGRSP), which supported electricity-sector restructuring and Eskom’s financial sustainability. The ECGRSP also backed the establishment of the National Transmission Company South Africa (NTCSA) and greater private-sector participation in renewable energy. The 2025 Infrastructure Governance and Green Growth Program (IGGGP), at USD 474.5 million, strengthened implementation of electricity-market reforms and promoted renewable-energy integration. It also improved distribution efficiency, introduced transport-sector reforms, and incorporated social-protection measures tied to the just energy transition.

The central reform will transform South Africa’s state-owned power utility, Eskom, from the sole buyer and seller of electricity. The regulator, NERSA, has issued a market operator license to the market operator housed inside the NTCSA, Eskom’s ring-fenced transmission subsidiary. NERSA has also approved Grid Capacity Allocation Rules, setting out who may connect to the grid and in what order, and created a Market Surveillance and Competition Unit to police the new market. The target is for the wholesale market to account for 10 percent of total electricity transactions by December 2027. These steps are intended to open the sector to broader participation.

The Transnet Rail Infrastructure Manager allocates train paths across 21,232 km of track under a gazetted network statement, and the Department of Transport has issued slot licenses to private train operators, with at least 11 slots across six corridors awarded in August 2025 — a first for South African freight rail. The regulator is expected to approve at least six licensed new private rail and port operators by December 2027, with rail freight throughput rising from 161 to 180 million tonnes a year. South Africa also signed its first port terminal concession in December 2025, a 25-year deal with International Container Terminal Services for Durban Container Terminal Pier 2, which handles 46 percent of the country’s containers and should lift capacity from 2.0 to 2.8 million TEUs by 2028. Rolling stock investment is targeted to triple to R6 billion (roughly $360 million) a year.

“This operation sits squarely on the Bank’s Four Cardinal Points,” said Kennedy Mbekeani, Director General for the Southern Africa Region.

Mbekeani added that the program “crowds private capital into transmission and rolling stock, strengthens the institutions that let South Africa finance infrastructure on its own terms, targets the jobs a young population needs, and builds infrastructure that can stand climate pressure.” The Bank remains committed to supporting South Africa in implementing structural reforms in energy, transport and water effectively. Expected gains include shorter truck queues at Durban port and more reliable water supply. They also include competitively priced electricity for citizens. The program advances the country’s broader infrastructure reform agenda.