AMMAN SOLID WASTE MANAGEMENT

Last update: May 27, 2015 Last update: May 27, 2015

Details

Locations:Jordan
Start Date:Unknown
End Date:Unknown
Contract value: JOD 2,681,386
Sectors:Civil Engineering, Pollution & Waste Management (i ...
See more
Civil Engineering, Pollution & Waste Management (incl. treatment)
Categories:Works
Funding Agencies:
Date posted:Dec 17, 2012

Associated funding

Associated experts

Description

Construction of the Third Cell at the Existing Ghabawi Landfill, Amman, Jordan

The scope of work is as follows:

i. Earthworks: Excavation, construction of side-slope embankments, grading and compaction, approximately 500,500 m3 as cut and 46,100 m3 as fill. The total surface area of Cell # 3 is 110,200 m2;

ii. Supply and installation of Geosynthetics including HDPE Geomembrane, GCL, Protection Geotextile, Filtration Geotextile, and HDPE Geopipes;

iii. Construction of leachate collection system, as follows:

a. D 160 mm geopipe (inside diameter) approximately 955 m.

b. D 280 mm geopipe (inside diameter) approximately 1255 m.

c. D 400 mm geopipe (inside diameter) approximately 190 m.

iv. Reshape and restoration of the existing Cell # 1 grades and lining repair. Approximately moving 50,000 m3 of waste;

v. Quality assurance and quality control; and

vi. Production of As-Built Drawings and As-Built work file.
 