Ayeyarwady Integrated River Basin Management (AIRBM) Project: ESIA, ESMP and ARAPs Implementation Support for Stretch 1
Details
Locations:Myanmar
Start Date:Mar 18, 2019
End Date:Jan 18, 2022
Contract value: USD 817,075
Sectors: Environment & NRM, Social Development, Water Navigation & Ports & Shipping
Description
Project ID: P146482
Project: Ayeyarwady Integrated River Basin Management Project
Bid/Contract Reference No: C3-14
Scope of Contract: C3.14-ESIA & ESMP Supervision for Stretch 1
The consulting services (“the Services”) for Stretch 1 include:
Part 1: Preparation of an Environmental and Social Impact Assessment of Navigation Enhancements in Stretch 1 of the Ayeyarwady River between Mandalay and Nyaung U. The ESIA will assess the navigation enhancements design options proposed by Engineering Consultant and together with the Engineering Consultant, support DWIR in the selection of environmental, socially and economically viable navigation enhancements in Stretch 1.
Duration of Contract: 34 Month(s)