Construction of Interstate Bridge over Sava River near Gradiska

Last update: Jan 23, 2020 Last update: Jan 23, 2020

Details

Locations:Bosnia and Herzegovina
Start Date:Oct, 2019
End Date:Apr, 2022
Contract value: EUR 1,875,800
Sectors:Civil Engineering, Roads & Bridges
Civil Engineering, Roads & Bridges
Categories:Consulting services
Date posted:Jan 23, 2020

Associated funding

Associated experts

Description

Description: The consulting services (‘the Services’) include: the consultant shall perform, amongst other, the duties and authority of the FIDIC Engineer as specified in or necessarily implied from the FIDIC Red Book based works contracts for ‘Construction of Interstate Bridge over Sava River near Gradiska’ between Republic of Croatia and Bosnia and Herzegovina.

The works will include following components:
— access road to the bridge (expressway typical cross-section) on Croatian side in total length of 50,79m (shall be financed 100 % by Croatian side),
— interstate bridge over Sava river (expressway typical cross-section) in total length of 462,25m (shall be finance by RH and BiH, 50 % each),
— access road to the bridge (motorway typical cross-section) on BiH side in total length of 411,54 m (shall be financed 100 % by BiH side).

The expected implementation period for works contract as well as the respective FIDIC engineer services is: 30 months, for execution of the works (works), plus 24 months of Defects Notification Period (DNP), counted from the Intended commencement date for the works contracts.