Print
Rehabilitation and Extension of Muertendall Sanitary Landfill
Details
Locations:Luxembourg
Start Date:Jan 1, 1993
End Date:Unknown
Contract value: 47,000,000
Sectors: Civil Engineering, Pollution & Waste Management (incl. treatment), Procurement
Description
The contract awarded to KOCKS CONSULT GMBH by SIGRE included the following services:
- Design and detailed design of the whole landfill area;
- Construction quality assurance plan for the landfill bottom liner and capping systems;
- Stability calculations for the landfill slopes and the bottom liner and capping systems;
- Detailed designs for the first and second construction phases;
- Preparation of tender documents;
- Tender evaluation and recommendation of contract awards;
- Structural analyses of the buildings and engineering constructions;
- Design of the technical equipment for the buildings and engineering constructions;
- Design of the buildings;
- Advice on soil mechanics;
- Schedule for repositioning of waste;
- Surveying;
- Local construction supervision;
- Project management.
The following landfill components were designed:
- Planning of tipping phases and construction stages;
- Earthworks;
- Base lining (composite liner system);
- Leachate collection;
- Repositioning of waste;
- Landfill effluent gas collection system;
- Surface water drainage;
- Water supply and wastewater disposal;
- Entrance areas with administration and ancillary buildings.
Client: Syndicat Intercommunal pour la gestion des déchets ménagers, encombrants et assimilés en provenance des communes de la région de Grevenmacher, Remich et Echternach (SIGRE)
Period: 01/1993 - ongoing