Print

Fontoria water treatment plant and deposit along with the replacement of the pipe conduction in Paladeperre and Carlangas (Valdes)
Details
Locations:Spain
Start Date:Jan 1, 2007
End Date:Dec 31, 2007
Contract value: EUR 5,822,656
Sectors: Civil Engineering, Water, Sanitation & Hygiene
Description
Replacement of the current asbestos cement pipe conduction for a new cast iron one, with higher capacity volumes for future situations, is planned.
Layout is designed through accessible areas (paths, tracks, or local roads), reducing the number of crossings and invasions to private lands. This point has a relevant importance, since the “Rio Negro” river bank is considered a Place of Communitarian Interest according to “Red Natura 2000”.

