Print

11-385 BARC
Details
Locations:India
Start Date:Unknown
End Date:Dec 31, 2005
Sectors: Water & Sanitation
Description
KEY STAFF
Project Director M. Rognoni
Project Manager P. Lucchi
Process Manager A. Trezzi
Chief Designer A. Trezzi
Quality Controller D. Quaranta
PROCESS
Water to be treated
Total Design Capacity 50 t/d
Number of units 1×100%
Guaranteed TDS 0.5 ppm achieved either with SED
Process Arrangement MVC (Mech. Compressor by Piller) two effects
Tubes material Titanium
Shell material AISI 316L Stainless steel
Tubes fixing Rubber grommets
Top Brine Temperature 65°C.
Scope of work
Turn-key
Notes:
Distillate guarantee 0.5 ppm ensured by SED
One spare set of Al 5052 tubes are supplied for alternative test run.
Energy absorption = 8.5 kW/ton