Bankable Feasibility Study for a 200MW Concentrating Solar Power Plant
Details
Locations:Botswana
Start Date:Sep 1, 2011
End Date:Dec 31, 2012
Sectors: Energy, Research
Description
Client: Government of Botswana.
The government and BPC would like to promote private sector led development of a CSP in Botswana. The purpose of the proposed study is two-fold: (a) to perform a techno-economic assessment benchmarking; and (b) to develop a financial structure for the CSP project and a corresponding financing plan. The overall objective is to align the CSP technology energy output to the Botswana National Energy Policy, which advocates that by 2030, 25% of the electrical energy demand be met from renewable energy sources.
Services Provided:
Review and validation of Prefeasibility Study.
Demand forecast within the feasibility study.
Sites Assessment and Site Selection.
CSP Project Development Structure and Financing Plan.
Roadmap for Preparing and Launching the tender for CSP Project Sponsors/Investors.
Technical Performance Analysis.
Environmental Analysis.
Financial Analysis.
Economic Analysis.