Project ID: P164044

Project Title: ECOWAS-Regional Electricity Access Project

Bid/Contract Reference No: NG-ECOWAS-DEM-197717-CW-RFB

Scope of Contract:  Lot 3: Design, Supply and Installation for the Electrification of Villages in Mali. This lot has three phase distribution and MALT system

  • the design (update of the studies of the MV and LV networks for three phase distribution and MALT distribution) and approximately the following supply and installation based on the studies;
  • the supply and installation of 2583 km lines of three phase medium voltage (MV) 30 kV, some with distributed ground and some without,
  • the supply and installation of 92 km lines of single-phase medium voltage (MV) 17.32 kV with distributed ground,
  • the supply and installation of 484 three phase distribution substations of 30 kV / 400 V,
  • the supply and installation of 176 single phase distribution substations of 17.32 kV / 230 V in MALT system,
  • the supply and installation of 1478 km lines of low voltage (LV) with distributed ground 400/230 V (both three phase and single phase),
  • the supply and installation of terminal connection equipment, in particular connection points, smart meters for big customers, prepayment meters, as well as pre-wired metering panels for customers of more than 70,000 homes at low-voltage.


Duration of Contract: 30 Month(s)