Description

Reference number: CTB MOZ-MOZ1503411-10013 -F05_0

Contract No: MOZ1503411-10013

Short description:  FUNAE intends to electrify 5 villages in Zambézia and Nampula provinces, through photovoltaic mini-grids, to provide a continuous supply of electricity to those communities. Each mini-grid constitutes a lot:

Lot 2: Muite, Mecuburi district, Nampula province;

The objective is for the Contractor to design the executive project, supply materials and equipment, build, test and put the photovoltaic power plants and mini-grids into service, all in order to supply electricity to the village.

Specific objectives:

- Design the executive project of the photovoltaic plant, mini-grid and water supply system;
- Procure, supply DDP10 site, build and install the photovoltaic plant according to the approved Tender;
- Procure, supply DDP site and install all the equipment for the proper and reliable functioning of the plant for a continuous period of at least 5 years;
- Procure supply DDP site and install all the equipment and cables for the mini- grid from the photovoltaic plant up to the users;
- Procure and supply DDP and install prepaid electrical power meters;
- Procure, supply DDP Site and install a monitoring system for the solar power plant and mini-grid for operation;
- Design, procure, supply DDP site and build a water supply system at the solar power plant;
- Design, supply DDP and install a back-up diesel generator;
- Train all plant operator personnel;
- Perform the testing, commissioning and put the power plant and water pumping system into service.

Duration of the contract, framework agreement or dynamic purchasing system
Duration in days: 365