Construction of Three tunnels by NATM with Ballastless Track in Panvel - Karjat Section in connection with Panvel - Karjat double line Suburban Corridor Project of Mumbai Division of Central Railway in the State of Maharashtra
Details
Locations:India
Start Date:Unknown
End Date:Unknown
Contract value: INR 2,520,000,000
Sectors: Civil Engineering, Roads & Bridges
Description
Project Name: Mumbai Urban Transport Project - III
Project Number: 000228
Contract Reference No: MRVC/W/110
Description: Construction of 3 Tunnels with Ballastless Track, E&M Work, Open cut on approaches and other incidental & misc. works: It will cover construction of three tunnels by NATM as per approved drawing provided by MRVC for the project. As per the alignment finalised during FLS, the total length of tunnels is 3.119 KMs. The length of longest tunnel is 2.60 KMs at Waverle and other two tunnels are of 219M at Nadhal & 300M at Kiravali length. Bids for construction of tunnels are invited through this “Construct only” contract through Lumpsum tender.
Duration of Contract: 36 Months