Print

Lublin Waste-Water Treatment plant Modernization
Details
Locations:Poland
Start Date:Jan 1, 2009
End Date:Dec 31, 2009
Sectors: Civil Engineering, Pollution & Waste Management (incl. treatment), Procurement
Description
Client: MPWiK Lublin.
Services: EXECUTION / Detailed Design.
Tractebel Engineering did the detailed design and prepared the complete tender documentation for the modernization of the Waste-Water Treatment Plant (WWTP) in Lublin (120,000m³).
The plant’s technological equipment was modernized together with the biogas net, the main switching station, the departments’ switching stations R1, R2, R3, etc.
Our documentation served as a basis for the construction tender. Tractebel Engineering is now assisting in supervising the construction works.