Print

Acquisition of KRAZ Spare Parts & Mine Protected Vehicle (MPV) Tires (2063298 & 2063299): Kraz Mpv Spare Parts, Lot 1
Details
Locations:Mali
Start Date:Dec, 2022
End Date:May, 2023
Contract value: USD 44,018
Sectors: Vehicles
Categories:Goods
Funding Agencies:
Date posted:Mar 6, 2023
Description
Reference: ITB/2022/43868
Description: Lot 1 - Kraz Mpv Spare Parts
Technical specifications for Goods and Comparative Data Table
Item No / UNOPS minimum technical requirements / Part Number / Part Number (Alternate) / Qty
1 - RADIATOR EXPANSION TANK - 6510-1311010 - 20
2 - LIGHT - SIDE INDICATOR 112-01-12 109831 - 15
3 - ALTERNATOR - 28V ECM (270 AMP) - 24v,270 amp J-180 Alternator c/w Mount,60mm Pulley Lare Shaft 8 Groove - 5
4 - HALF SHAFT RH - 6505-2403070 - 5
5 - HALF SHAFT LH - 6505-2403073 - 5
6 - TIRE VALVE - V3-20-6 - 20
7 - COMPRESSOR - AIR 161-3509012-20 - 5
8 - RADIATOR CAP - 256B-1304010 - 10
9 - PIPE - FUEL PIPE - 5133BE-1104221-10 - 5133ВЕ1104221-Д10 - 4
10 - HOSE 80CM - 65055-3506207-20 - 20
11 - HOSE - AIR 170CM - 65055-3506509-20 - 5
12 - HOSE - AIR 110CM - 65055-3506251-10 - 10
13 - STEERING SHAFT WITH COLUMN - 6510-3401008 - 5
14 - HOSE - 5133B2-1602312-000 - 5133В2- 1602312-000 - 8
15 - STARTER MOTOR (SMALL) - 2501-3708-2145 - 25.3708-20 - 10
16 - PROPSHAFT-GEARBOX TO TRANSFER CASE - 65032-2218010 - 2
17 - A/C PRESSURE SWITCH - 4112851A - 15
18 - OIL TANK - STEERING - 6505-3410008 - 5
19 - MOTOR - WINDSCREEN WASHER (BOTTLE AND MOTOR) - 1112-52085 - 1112.5208-03 /65255-5208000 - 20
20 - HOSE - POWER HOSE - 251-3408064 - 10
21 - R.H. pipe rear brake chamber - 65055-3506400 - 5
22 - SWITCH-WINDSHIELD WIPER - BK1-09-09 - 4
23 - HOSE - FLEXIBLE HOSE TO FRONT BRAKE CHAMBER 2 - 5133BE-3506060-000 - 6
24 - REAR AXLE PROPELLER SHAFT ASSY - 05131BE-2201010 - Э5131BE2201010 - 2
25 - BEARING - INNER HUB BEARING - 2556-3103020 - 4
26 - PIPE - HEATER CONNECTIVE PIPE RIGHT - 6437-1303038-10 - 5
Duration: Lot 1
- Option 1 - FCA point
- Option 2 - Sea Freight: FCA point within 14 weeks after Contract signature.
Delivery to DAP point shall take place no later than 20 weeks after Contract signature
Option 3 - : Air Freight: FCA point within 14 weeks after Contract signature. Delivery to CPT point shall take place no later than 16 weeks after Contract signature

