Construction of Water Management Structures – Bucim Mine –Radovis
Details
Locations:North Macedonia
Start Date:Oct 14, 2009
End Date:Unknown
Contract value: USD 600,584
Sectors: Civil Engineering, Energy, Water, Sanitation & Hygiene
Description
Contract Reference Number :28/2009
Description of Contract:
Construction of Water Management Structures – Bucim Mine –Radovis” consisted of:
a. Intake of water:
- Construction of small impounding Dam D1 at Bucimski Dol with construction of settlement tank;
- Gravity HDPE pipeline PL1, ?200 with length L=1,363m, from Dam D1 to Dam D2 at Jasenov Dol.
- Construction of small impounding dam Dam D2 with at Jasenov Dol with construction of settlement tank;
- Gravity HDPE pipeline PL2, ?250 with length L=283.7m, from dam 2 to Pumping Station 1 (PS 1);
b. Pumping Station 1 (PS1) with reservoir for accumulation of collected water.
c. Pressure HDPE pipeline PL3, ?200 with length L=1,404m, leading away the treated waters from PS1 to PS2.
d. Pumping Station 2 (PS2) with reservoir for accumulation of collected water. Two groups of pumps: (1) For pumping of water to existing reservoirs for technical water and/or tailings pond and (2) For pumping of water for irrigation of the waste rock dump and or to the tailings pond.
e. Pressure HDPE pipeline PL4, ?200 with length L=937m, from PS2 to existing reservoirs for technological water;
f. Pressure HDPE pipeline PL5, ?200 with length L=937m, from PS2 to the waste rock dump.
g. Pressure PVC pipeline PL6, ?225 with length L=1,500 m, from PS4 to the tailings pond.
h. Electrical power installations: PS1 & PS2 - Construction/installation of electrical installations, including connection to main power sources, transformer and connection, as well as control & automation lines & equipment.