Print

Water management infrastructure of Říčany - II. part - Construction of water supply and sewerage in the Ryba locality
Details
Locations:Czech Republic
Start Date:Oct 31, 2024
End Date:Nov 21, 2025
Contract value: CZK 16,686,679
Sectors: Civil Engineering, Water & Sanitation
Categories:Works
Funding Agencies:
Date posted:Oct 24, 2024
Description
2.1. Procedure
Title: Water management infrastructure of Říčany - II. part - Construction of water supply and sewerage in the Ryba locality
Description: The public order entitled "Water management infrastructure of Říčany" is divided by the contracting authority into four parts marked with Roman numerals (I., II., III., IV). Each of these parts will be awarded in a separate procurement procedure in accordance with § 18, paragraph 1, letter a) ZZVZ These are separate procurement procedures. Part I - Reconstruction of the water treatment plant and restoration of wells II. part – Construction of water supply and sewerage in the Ryba III location. part – Construction of water supply and sewerage at Dubu and Otavská III. part - Completing the water supply and sewerage lines including connections in Pacov Currently, only part 2 is awarded within this procedure, i.e. in this procedure, bids are submitted only for this performance. This procurement documentation, including attachments, relates exclusively to the 2nd part of the public contract. The contract in question includes the construction of water supply lines including connections in the Ryba locality. The goal of the project is to build a water supply network with a length of 1565 m and 82 connections (public part) with a length of 185.98 m in the Ryba locality. A total of 1,751 m of lines with connections will be built and 287 residents in localities will be connected to the supply of high-quality drinking water (coefficient 3.5). ATS Ryba must be built in Ryba to ensure system pressure. Inhabitants of these localities have been dealing with a lack of, and above all, poor quality, water from their own wells for a long time. Considering the geological conditions of the Ryba locality, it is necessary to connect the new ATS Ryba to the DN500 supply steel line leading to the Olivovna reservoir. The connection of the proposed building will be made using the supply line IO 01 opening to the ATS Ryba building. The length of the distribution line in Ryba is 1564.33 m. Object IO 01.1. serves to lead the line to ATS Ryba. From it, the distribution series IO 02., 02.2, 03.1., 03.2. and 03.3. These rows will supply the Fish. New fire hydrants, new underground hydrants to remove sludge will be implemented. The construction of the ATS will also require the laying of the LV and HV power cable. Furthermore, part of the public contract is the construction of sewers with connections in the Ryba locality. The length of the sewers is 1734 m, the length of 80 connections 120 m. In total, according to PD, 1854 m of sewers will be built and 280 residents will be connected
Internal identifier: VZ 3/2024