Print

Construction of new roof for Kava storage facility at ACTIV Association in Stella Mare
Details
Locations:Vanuatu
Start Date:Unknown
End Date:Aug 31, 2024
Sectors: Civil Engineering
Categories:Works
Funding Agencies:
Date posted:Apr 28, 2025
Description
Reference: RFQ 24-6171
Description: Construction of New roof for Kava storage facility at ACTIVE at Stella Mare in Vanuatu as per Engineering Drawing submitted herein. The structural construction should be in accordance with the Vanuatu National Building Code 20011 and Building Specifications and strong to bwithstand Category 5 hurricane winds.
Roofing System:
▪ Engineered, H3 treated, factory pre-cut, timber trusses and/or MSG8 H3.2 Kiln dried NZ Pine
exposed rafters
▪ Timber ridge beams laminated MSG8 H3.2 KD NZ Pine
▪ Cyclone ties, strap bracing and brackets
▪ Purlins secured w/ lumberlok CT400 cleats and/ or batten screws
▪ Sisilation insulation material
▪ Colorbond/ Galvanised corrugated steel roofing, barge flashings and cyclone washers & screws.