Abu Dhabi Crude Oil Pipeline Project
Details
Locations:UAE
Start Date:Jan 1, 2007
End Date:Dec 31, 2013
Sectors: Civil Engineering, Energy, Training
Description
The pipeline ties into the existing ADCO system at MP21 and runs from Habshan (Main pump station) via Sweihan (Intermediate pump station) to the terminal in Fujairah and can be seen as optional export route for crude oil bypassing the Strait of Hormuz.
Technical data:
Medium: oil
Length: 403 km
Diameter: 48”
Pump discharge pressure: 90 bar
Capacity: 1.5 MMBPD
No. of pump stations: 2
Total installed power: 68 MW
No. of terminals: 1
No. of tanks: 8
Working capacity: 160,000 m³/each
Loading facilities
Total installed power: 32 MW
Offshore loading lines:
Length: 3 x 5 km
No. of Single Point Moorings: 3
ILF Services:
Project management
System concept incl.Route Selection
Authority Engineering including EIA
Review of Front End Engineering Design
EPC and LLI tendering
Detailed design vetting
Construction management and site supervision
Commissioning management
Operator training
Highlights:
Pipeline routing through extremely difficult mountainous terrain west of Fujairah.
Client: International Petroleum Investment Company (IPIC).