Abu Dhabi Crude Oil Pipeline Project

Last update: Jul 29, 2015 Last update: Jul 29, 2015

Details

Locations:UAE
Start Date:Jan 1, 2007
End Date:Dec 31, 2013
Sectors:Civil Engineering, Energy, Training
Civil Engineering, Energy, Training
Categories:Consulting services
Funding Agencies:
Date posted:Jan 22, 2015

Associated funding

Associated experts

Description

The pipeline ties into the existing ADCO system at MP21 and runs from Habshan (Main pump station) via Sweihan (Intermediate pump station) to the terminal in Fujairah and can be seen as optional export route for crude oil bypassing the Strait of Hormuz.

Technical data:

    Medium: oil
    Length: 403 km
    Diameter: 48”
    Pump discharge pressure: 90 bar
    Capacity: 1.5 MMBPD
    No. of pump stations: 2
        Total installed power: 68 MW
    No. of terminals: 1
        No. of tanks: 8
        Working capacity: 160,000 m³/each
        Loading facilities
        Total installed power: 32 MW
    Offshore loading lines:
        Length: 3 x 5 km
    No. of Single Point Moorings: 3

ILF Services:

    Project management
    System concept incl.Route Selection
    Authority Engineering including EIA
    Review of Front End Engineering Design
    EPC and LLI tendering
    Detailed design vetting
    Construction management and site supervision
    Commissioning management
    Operator training

Highlights:

    Pipeline routing through extremely difficult mountainous terrain west of Fujairah.

Client: International Petroleum Investment Company (IPIC).